In The Furrow Operation; Twice Daily Or After Every 5 Hours Of Operation; Daily Of After Every 10 Hours Of Operation; Periodic Or Once Per Season - International 710 Operator's Manual

Moldboard plow semi-mounted type 4,5/6 and 6 furrow
Table of Contents

Advertisement

LUBRICATION
IN-THE-FURROW
OPERATION
Paragraph
numbers
refer
to
corresponding
numbers
in
the
il-
lustrations
The
symbols around
the
reference
numbers
indicate
the intervals of lubrication.
Mlust.39
ln-the-furrow
operation
shown.
1.
Rolling
colter
bearings
(yoke
type)
(two
fittings
per
colter).
1.
Hitch
pivot
(2 fittings).
2.
Rear
furrow wheel
(6 fittings).
3.
Steering pipe
pivot
arm
(1 fitting).
4.
Automatic Trip
Beam
(6 fittings
per beam).
4A.
Cushion
Spring
Sidearm
(1 fitting
per
colter).
5.
Automatic Trip
Beam
(5
places per
beam).
6.
Steering
link pivot
points
(4
places).
Twice
Daily
or
After
Every
5
Hours
of
Operation
Use
a
pressure
lubricating
gun and
apply
IH 25
1H
EP
grease
(or
equivalent #2 multi-
purpose
lithium
grease)
sufficient to flush
out the old
grease and
dirt.
Daily
or
After
Every
10
Hours
of
Operat
ion
Use
a
pressure
lubricating
gun and
apply
IH
251H
EP
grease
(or
equivalent
#2
multi-
purpose
lithium
grease)
sufficient to flush
out the old
grease and
dirt.
Use
oil
can.
13.
Rear
furrow wheel
bearing.
15.
Gauge
wheel
bearing.
16.
Rolling
colter
hub
bearing.
Periodic
or
Once
Per Season
Remove,
clean
and repack
this
bearing by
hand using IH
25
IH
EP
grease
or equivalent
#2 multi-purpose
lithium
grease.
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents