14-7 Installation Diagram of Indoor Unit and Outdoor Unit

14-7-1 Air-Purge Procedure
1) Connect each assembly pipe to the appropriate valve
on the outdoor unit and tighten the flare nut.
2) Connect the charging hose of low pressure side of
manifold gauge to the packed valve having a service
port as shown at the figure.
3) Open the valve of the low pressure side of
manifold gauge counter-clockwise.
4) Purge the air from the system using vacuum pump
for about 10 minutes.
– Make sure that pressure gauge show
-0.1MPa(-76cmHg) after about 10 minutes.
– This procedure is very important in order to avoid
gas leak.
– Turn off the vacuum pump.
– Close the valve of the low pressure side of
manifold gauge clockwise.
– Remove the hose of the low pressure side
of manifold gauge.
5) Set valve cork of both liquid side and gas side of
packed valve to the open position.
6) Mount the valve stem nuts and the service port cap
to the valve, and tighten them at the torque of
183kgf . cm with a torque wrench.
7) Check for gas leakage.
- At this time, especially check for gas leakage from
the 3-Way valve's stem nuts, and from the service
port cap.
Samsung Electronics
A
B
C
D

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eh035eavEh052eavUh035eavUh052eavUh070eavEh070eav

Table of Contents