Download Print this page

Leclerc Looms 1009-0000 Assembly Instructions Manual

Artisat 36" jack-type 4 shaft loom

Advertisement

Quick Links

1972 Avenue Simoneau
C. P. 4
Plessisville, Qc.
G6L 2Y6
TEL: 819-362-7207
FAX: 819-362-2045
www.leclerclooms.com
leclerc@leclerclooms.com
ARTISAT 36"
JACK-TYPE
4 SHAFT LOOM
1009-0000
On receiving the loom, unpack
and lay out the loom components.
Do NOT discard any packing material
until all parts are inventoried.
Check the parts received against
the parts list on pages #2 to #5 of
the assembly instructions. Report any
discrepancies to Leclerc or your
dealer immediately.
To assemble this loom, a
minimum of 2 people are
needed but 3 are
recommended.
leclerc\inst\artisat\4s.frp
Jan. 2000

Advertisement

loading

Summary of Contents for Leclerc Looms 1009-0000

  • Page 1 ARTISAT 36" JACK-TYPE 4 SHAFT LOOM 1972 Avenue Simoneau 1009-0000 C. P. 4 Plessisville, Qc. G6L 2Y6 TEL: 819-362-7207 FAX: 819-362-2045 www.leclerclooms.com leclerc@leclerclooms.com On receiving the loom, unpack and lay out the loom components. Do NOT discard any packing material until all parts are inventoried.
  • Page 2 PARTS LIST (4s) 1 LEFT-HAND SIDE Note for Leclerc in French: Trous de bout avec mèche 1 RIGHT-HAND SIDE 17/64" Note for Leclerc in French: Surveiller l'amanchement avec les pattes avant. 1 TREADLE-SET CROSS-MEMBER 1 MIDDLE LOWER CROSS-MEMBER 6 TREADLES 1 Treadle set rod with one push nut (14½") 1 More treadle push nut 2 TREADLE set SUPPORTS...
  • Page 3 PARTS LIST (4s) CORD 1 PK. 10 YDS FOR BEAM STICK 1 PK 5 YDS FOR BEAMING AND LEASE STICK 1 SHUTTLE 1 DOZ BOBINES 4" 1 CLOTH BEAM WITH RATCHET WHEEL 1 WARP BEAM WITH BRAKE DRUM 1 TAKE-UP MOTION HANDLE 1 CASTLE TOP COVER (SHELF) 1 BATTEN HANDTREE 1 BATTEN SLEY WITH SHUTTLE RACE...
  • Page 4 PARTS LIST (4s) 4 SHAFT (harness) FRAME 10½" 1 REED 2 LEASE STICKS 1 BEAM STICK 3 WARP RODS 10½" 1000 HEDDLES 1 HEDDLE AND REED HOOK 1 Multi bits Screwdriver 1 Adjustable Wrench 6 TREADLE HOOKS 7 " LONG 12 TREADLE CORDS 7"...
  • Page 5 PARTS LIST (4s) Machine bolts 1 - 7/16 X 3½" (12 mm 90 mm) 1 - ¼" x 3" (lams) Carriage Bolts 2 - ¼ X 3¼" (6 mm x 80 mm) 2 - ¼" X 3" (6 mm x 75 mm) 2 - ¼"...
  • Page 6 ASSEMBLY NOTE: Application of soap to the screws will make their insertion easier. Loom Left Side Using a 2" (50-mm) round-headed screw no 14, affix the lower middle cross-member B to the bottom of left-hand side A. The lower middle cross-member has a hole at either end;...
  • Page 7 Unfold the front section of the left-hand side A. Using a ¼" x 1¾ (6mm x 45mm) carriage bolt and a ¼" (6mm) wing nut, affix metal hook C to left-hand side front post D. Using a ¼" x 1¾" (6mm x 45mm) carriage bolt and a ¼"...
  • Page 8 Using a 2" (50 mm) round-headed screw no. 14, affix right-hand side A` to lower middle cross-member B. Place the take-up motion handle E, on the right-hand side of cloth beam F. NOTE: The ratchet gear is on the right-hand side beam end. The ratchet pawl P affixed to the brake lever must be lifted up.
  • Page 9 Using two 2" (50 mm) round-headed screws no. 14, affix one of the two breast beams to the top of the front posts B and B`. PAGE 9...
  • Page 10 Insert two ¼" x 3" (6 mm x 75 mm) carriage bolts into treadle-set cross-member A. The bolt heads must be to the underside. The 2 center holes are for a 6 treadle set and the 2 outside ones are for the 10 treadle set. Using ¼"...
  • Page 11 Insert on the treadle rod (with push nut) D: 1 Washer 9/16", (One treadle and one treadle spacer) 5 times, One treadle, One Washer 9/16" and one Push nut. Washer 9/16" Push Nut Put the treadle support on each side and install it on the loom using one ¼"...
  • Page 12 Unfold the back portion of the loom and lock it there with metal hook A PAGE 12...
  • Page 13 Slide jack box B between posts A and A', from bottom to top, and affix it to blocks C and C' using eight 1½" (40 mm) round-headed screws no. 12. The ratchet pawl Q affixed to the side of the loom must be lifted up while inserting the Jack Box.
  • Page 14 Washer ¼" (6mm)s Using a 1/4" x 3" (6mm x 75mm) machine bolt, one washer ¼" and a 1/4" square nut, affix the four lams B to metal lam support C of the right-hand side main post A'. PAGE 14...
  • Page 15 Install the heddles in the shaft frames. (see "WARP AND WEAVE" on page 10) Slide shaft frames between dividers D. The shaft frames must rest on the plastic supports of the jacks (shaft guides) The Leclerc Logo must be on top, facing the front of the loom.
  • Page 16 Install the treadle cord with the treadle hook. Using the carriage bolts, steel washers and square nuts, attach the batten sley A (with shuttle race) to the batten swords B. Then affix the batten handtree C to the batten swords B. Install reed D in the slots of batten handtree C and batten sley A.
  • Page 17 If the batten does not touch the two bumpers equally, loosen the bolts of the batten sley and batten handtree and exert pressure on the batten centering it in its proper place. Tighten the bolts again while keeping pressure in the batten. PAGE 17...
  • Page 18 Unhook brake treadle cord C from the brake realease treadle. Hold circular wire brake shoe D up slightly to the rear of the loom. Insert one end of the warp beam (which has only a metal post) into the left-hand side back post.
  • Page 19 Insert the brake end of the warp beam into the hole of the right-hand side back-post. Install the 7/16" X 3½" machine bolt through the right-hand side back post and into the warp beam. Using crank E, tighten the machine bolt into the warp beam. PAGE 19...
  • Page 20 Attach the end of circular brake shoe D (brake circle) to the hook of spring F Then attach cord C to the hook of brake treadle G See "Warp and Weave" book (friction brake section page 87) PAGE 20...
  • Page 21 Using two 2" (50 mm) round-headed screws no. 14, affix one of the other breast beams to the top of the back posts. PAGE 21...
  • Page 22 FIRST TREADLE TIE-UP Select any treadle and tie the Lams to it using the 7" cords supplied with the loom. Take the heddle hook to help thread the cord through each hole of the lam. Slide the Treadle Hook through the Screw Eyes and Cord Loops. PAGE 22...
  • Page 23 Thread the 10 yard (9 m) cord through the middle hole of beam stick A. Then pass the two ends (equal in length) of this cord through the middle holes of the warp beam. Continue threading the cord through the warp beam and beam stick A. Knot the cord at each end of the beam stick.
  • Page 24 Cut the 5-yard (4.5 m) cord in half. One half of this cord laces beam stick A to warp rod B. Insert a metal rod into the apron of the cloth beam. Use the other half of the cord to lace this rod to the third metal rod.