Circutor CirPower Hyb 4k-48 Instruction Manual
Circutor CirPower Hyb 4k-48 Instruction Manual

Circutor CirPower Hyb 4k-48 Instruction Manual

Hybrid inverter
Table of Contents

Advertisement

Quick Links

Hybrid inverter
CirPower Hyb 4k-48
INSTRUCTION MANUAL
(M053B01-03-17A)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CirPower Hyb 4k-48 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Circutor CirPower Hyb 4k-48

  • Page 1 Hybrid inverter CirPower Hyb 4k-48 INSTRUCTION MANUAL (M053B01-03-17A)
  • Page 2 CirPower Hyb 4k-48 Instruction Manual...
  • Page 3: Safety Precautions

    CIRCUTOR, SA reserves the right to modify features or the product manual without prior notifi cation. DISCLAIMER CIRCUTOR, SA reserves the right to make modifi cations to the device or the unit specifi ca- tions set out in this instruction manual without prior notice.
  • Page 4: Table Of Contents

    CirPower Hyb 4k-48 CONTENTS SAFETY PRECAUTIONS �������������������������������������������������������������������������������������������������������������������������������������� 3 DISCLAIMER ��������������������������������������������������������������������������������������������������������������������������������������������������������� 3 CONTENTS ������������������������������������������������������������������������������������������������������������������������������������������������������������ 4 REVISION LOG ������������������������������������������������������������������������������������������������������������������������������������������������������ 6 1�- VERIFICATION UPON RECEPTION ���������������������������������������������������������������������������������������������������������������� 7 1�1�- PROTOCOLO DE RECEPCIÓN ���������������������������������������������������������������������������������������������������������������� 7 1�2�- TRANSPORT AND HANDLING ��������������������������������������������������������������������������������������������������������������� 8 1�3�- STORAGE�������������������������������������������������������������������������������������������������������������������������������������������������� 8 2�- PRODUCT DESCRIPTION �������������������������������������������������������������������������������������������������������������������������������� 9 3�- DEVICE INSTALLATION ���������������������������������������������������������������������������������������������������������������������������������...
  • Page 5 CirPower Hyb 4k-48 8�2�2�- GENERATED POWER REGISTER ������������������������������������������������������������������������������������������������� 72 8�3�-DISPLAY VALUES ��������������������������������������������������������������������������������������������������������������������������� 72 8�3�1�- INVERTER ��������������������������������������������������������������������������������������������������������������������������������������� 72 8�3�2�- BATTERY ����������������������������������������������������������������������������������������������������������������������������������������� 74 8�3�3�- USER ����������������������������������������������������������������������������������������������������������������������������������������������� 75 8�3�4�- INVERTER INFORMATION ������������������������������������������������������������������������������������������������������������� 76 8�4�- ALARMS AND WARNINGS REGISTER ��������������������������������������������������������������������������������������� 76 8�4�1�- ALARM �������������������������������������������������������������������������������������������������������������������������������������������� 76 8�4�2�- WARNINGS �������������������������������������������������������������������������������������������������������������������������������������...
  • Page 6: Revision Log

    CirPower Hyb 4k-48 REVISION LOG Table 1: Revision log� Date Revision Description 11/15 M053B01-03-15A Initial Version Changes in sections: 1.1. - 5.3. - 5.6.1.- 5.8. - 5.9. - 6.2. - 7.1.1.- 7.1.7.4. - 7.1.8. - 05/16 M053B01-03-16A 7.2. - 7.2.1.1. - 7.2.1.2. - 7.2.1.4. - 7.2.1.5. - 7.2.1.6. - 7.3. - 8.
  • Page 7: 1�- Verification Upon Reception

    CirPower Hyb 4k-48 1�- VERIFICATION UPON RECEPTION 1.1.- PROTOCOLO DE RECEPCIÓN Check the following points upon receiving the device: a) The device meets the specifications described in your order. b) The device has not suffered any damage during transport. c) Perform an external visual inspection of the device prior to switching it on.
  • Page 8: 1�2�- Transport And Handling

    CirPower Hyb 4k-48 E15311 Made in EU (Spain) CIRCUTOR SA - Vial Sant Jordi, s/n 08232 Viladecavalls (Barcelona) Spain 08232 CirPower Hyb 4k-48 AC Grid: Input 230 V~ 50Hz 17.4 A 4000W (cosφ=1)/3600W (cosφ=0.9) AC Load: Output 230V ~ 50Hz 17.4A PF-0.5...0.5 - 4000W(cosφ=1)/3600W(cosφ=0.9)
  • Page 9: 2�- Product Description

    CirPower Hyb 4k-48 2�- PRODUCT DESCRIPTION The CirPower Hyb is a 4 kW hybrid inverter that works like a power management system by managing energy flows between solar panels, batteries, power loads and the grid. The device uses various power management strategies to adapt to the needs of the user. It uses applications both outside the grid and applications connected directly to the grid.
  • Page 10: 3�- Device Installation

    CirPower Hyb 4k-48 3�- DEVICE INSTALLATION 3.1.- PREVIOUS RECOMMENDATIONS In order to use the device safely, it is critical that individuals who handle it follow the safety measures set out in the standards of the country where it is being used, use the necessary personal protective equipment, and pay attention to the vari- ous warnings indicated in this instruction manual.
  • Page 11: 3�2�-Location

    CirPower Hyb 4k-48 3.2.-LOCATION Before choosing the installation location, follow these recommendations:  Device must be installed over a flat solid surface.  Place must be selected according to size and weight of inverter.  Install the CirPower Hyb vertically, in order to cool properly the device...
  • Page 12: 3�3�- Installation

    CirPower Hyb 4k-48 3.3.- INSTALLATION Follow these steps for proper installation: 1�- Take into account the minimum distances to other objects, devices, walls, floor and ceiling, to guarantee proper cooling of the device ( Figure 4 Table 3: Minimum distances�...
  • Page 13 CirPower Hyb 4k-48 3�- Hang the device, ensuring it is correctly fixed to the wall-mount support. ( Figure 6 Figure 6: Hang the device� Note: The wall-mount support is ready for using a safety lock ( ). (10.5 mm diameter).
  • Page 14: 4�- Safety

    CirPower Hyb 4k-48 4�- SAFETY 4.1.- SAFETY PRECAUTIONS This item defines the safety precautions that must be followed during any operation done in the device� Installation and use must be done according to the Electrical National Code. Risk of death due to dangerous voltages�...
  • Page 15: 4�2�- Protection Elements External To The Cirpower Hyb

    CirPower Hyb 4k-48 Warning, residual current Every solar panel have a certain parasitic capacitance that depends on the mate- rial characteristics, type of assembly, environmental conditions, etc. This parasitic capacitance, combined with the topology of the transformerless inverter, generates residual currents during grid current injection. This current will be added to the current from a potential defect due to the contact of a person to an active conductor.
  • Page 16: 4�2�2 Residual Current Circuit Breaker

    CirPower Hyb 4k-48 4�2�2 RESIDUAL CURRENT CIRCUIT BREAkER It is required that a residual current circuit breaker is installed at the connection to the grid. Residual current circuit breaker must trip with currents of 30mA and higher. For AC output connection is mandatory to use an external type A RCB, rated for 25A 30mA.
  • Page 17: 5�- Connections

    CirPower Hyb 4k-48 5�- CONNECTIONS 5.1.- ELECTRICAL CONNECTIONS CirPower Hyb connectors are shown at Figure 8 Figure 8:Terminal connections� Table 5: Terminal connections� Description Communications cable gland Ethernet cable gland PV switch Grid connector AC Output Battery cable gland (-)
  • Page 18: 5�2�- Connection Diagram

    CirPower Hyb 4k-48 5.2.- CONNECTION DIAGRAM AC grid/ Red CA AC output / Salida CA Battery + / Batería + Battery - / Batería - FV+, FV - Figure 9: Connection diagram 5.3.- GRID CONNECTION Figure 10: Grid connection� AC grid input must be protected from short-circuit currents higher than 31A to guarantee the safety of the equipment.
  • Page 19 CirPower Hyb 4k-48 Check that the PV switch is off. Meet your grid operator connection conditions. Risk of death due to dangerous voltages� Do not connect the grid to the AC Output connector� If the grid is connected to the AC Output connector, the anti-islanding protection will not be ensured and the AC Output connector will not protect the user from the dangerous voltages.
  • Page 20: 5�4�- Ac Output Connection

    CirPower Hyb 4k-48 5.4.- AC OUTPUT CONNECTION Figure 12: AC output connection� Hybrid inverter allow the connection of loads to the AC Output terminal. This output is powered by Ac-In. In case of Ac-In failure, it is powered either by battery or solar power.
  • Page 21: 5�5�- Battery Connection

    CirPower Hyb 4k-48 5.5.- BATTERY CONNECTION Figure 14: Battery connection� Before starting the procedure, be sure that the grid connection circuit breaker and PV switch are both switched off� Signal and ensure that there is no re-connection by accident� Warning, damage to the invertir due to shortcircuit or incorrect connection of the battery terminals�...
  • Page 22 CirPower Hyb 4k-48 - Tighten nut. Tightening torque: 10 - 12Nm. TIGHTEN NUT M10 RING TYPE TERMINAL M8 RING TYPE TERMINAL FUSE Battery connection ( Positive terminal ) Battery connection ( Negative terminal ) Figure 15:Battery connection � 4�- Connect negative terminal.
  • Page 23: 5�6�- Solar Panel Connection

    CirPower Hyb 4k-48 Figure 16:Connect NTC� 5.6.- SOLAR PANEL CONNECTION 5�6�1 SOLAR PANEL ARRAY SIzING Solar panels must have an IEC 61730 Class A rating. PV modules should withstand a maximum system voltage not lower than 700 Vdc Number of solar panels connected in series in an array must be carefully chosen taking into account the maximum DC voltage of the inverter, and must guarantee that the maximum solar panel array voltage is within inverter limits at any environmental condition.
  • Page 24: 5�6�2 Solar Panel Array Connection

    CirPower Hyb 4k-48 the inverter. 3�- Solar modules used with the CirPower Hyb must have a maximum parasitic capacitance of 50nF/kWp. 5�6�2 SOLAR PANEL ARRAY CONNECTION Figure 17: Solar panel array connection� Solar modules have always voltage at their connections, if exposed to sunlight.
  • Page 25 CirPower Hyb 4k-48 voltage is lower than the maximum DC voltage of the inverter. Use proper measurement equipment, CATII 1000V minimum Do not reverse the polarity, and guarantee that the open circuit voltage is below the maximum allowed voltage� Fail to meet will damage the device�...
  • Page 26: 5�7�- Inverter And Solar Panels Earth Grounding

    CirPower Hyb 4k-48 5.7.- INVERTER AND SOLAR PANELS EARTH GROUNDING The CirPower Hyb is a transformerless inverter, without galvanic isolation between grid and solar panels� Therefore, solar panel active conductors (PV+, PV-) must not be connected to earth, and must be floating.
  • Page 27 CirPower Hyb 4k-48 Figure 21: Unscrew completely the front cover screws� 5�- Open the cover. ( Figure 22 Figure 22:Open the cover� 6�- Pass the RS-485 cable through the cable gland. Cable gland torque: 3 ... 4 Nm. 7�- Route the RS-485 cable to the display, using the plastic guides (...
  • Page 28 CirPower Hyb 4k-48 Figure 23:Route de RS-485 cable to the display� 8�- Plug the R-S485 connector to the female located at the bottom of the display ( Figure 24 Figure 24:RS485 connector� RS-485 connector pin out: Table 6: RS-485 connector pin out�...
  • Page 29: 5�9�- Ethernet Cable Connection

    CirPower Hyb 4k-48 5.9.- ETHERNET CABLE CONNECTION Figure 25: Ethernet connection� To get access to the Ethernet connector, follow these steps: Before starting the procedure, be sure that the grid connection circuit breaker is switched off� Signal and ensure that there is no re-connection by accident�...
  • Page 30 CirPower Hyb 4k-48 6�- Open the cover. ( Figure 27 Figure 27:Open the cover� 7�- Pass the Ethernet cable through the cable gland. ( ). After that, crimp the RJ45 plug. Figure 28 Cable gland torque: 3 ... 4 Nm.
  • Page 31: 6�- Commissioning

    CirPower Hyb 4k-48 6�- COMMISSIONING There is a risk of electric shock and explosion� keep the main cover closed and fixed at any time. 6.1.- COMMISSIONING Before powering on the inverter, check that following conditions are met: 1�- Check that the installation is correct and that all instructions have been followed.
  • Page 32: 6�2�- Start-Up Procedure

    CirPower Hyb 4k-48 6.2.- START-UP PROCEDURE The initial screen of the device, , is shown during several seconds, while the CirPower Figure 31 Hyb is performing a self-test Figure 31: Initial screen� To install the device the easiest possible way, first time the device is powered up, the display will show a setup wizard: Step 1�- Standard and language selection...
  • Page 33 CirPower Hyb 4k-48 Step 2�- Energy management strategy Select the available sources of energy of the installation and check for any existing direct loads connected to the AC output of the device, see 7.2.- PRINCIPLE OF OPERATION” “ Figure 33: Types of installations�...
  • Page 34 CirPower Hyb 4k-48 Figure 35: Shutdown: Master device� Each of the slave devices, , has to be assigned a Modbus address, in sequence from Figure 36 address no. 2. Example: in a system with 2 devices in phase 1(1 master + 1 slave) and 1 device in phase 2, the master device is given address no.1 by default and the slaves’...
  • Page 35 CirPower Hyb 4k-48 Step 4�- Management strategy The unit will indicate the possible energy management strategies according to the type of instal- lation that has been selected, see “7.2.1.- ENERGY MANAGEMENT STRATEGIES”� Figure 37: Energy management strategy� If you select the Off-Grid strategy pressing Next, the device jumps to “Step 8.- Battery selec-...
  • Page 36 CirPower Hyb 4k-48 Figure 39: Energy management strategy: Slave Device�  Maximum allowed injection Set maximum grid feed-in allowed power, as a % of the inverter power. For example, if you define a value of 25%, a maximum of 1000 W will be injected into the grid with a 4 kW CirPower Hyb.
  • Page 37 CirPower Hyb 4k-48 Now select the communications that will be used to communicate with the external analyser: • Ethernet (Modbus/TCP), • RS-485 (Modbus RTU), is a configuration with devices in parallel, only for master devices. • Master, only for slave devices.
  • Page 38 CirPower Hyb 4k-48  RS-485 If RS-485 is selected, you must configure the parameters of Figure 41 Figure 41: Strategy setup (RS-485)� Baud rate Select the baud rate: 9600 or 19200. Bits Select the numbers of bits : 7 or 8.
  • Page 39 CirPower Hyb 4k-48 Modbus peripheral No� In a modbus network, each device has a unique address. Modbus address - size The inverter must read the active consumed power of the installation being measured by the external analyzer. In this section, enter the modbus address where the external analyzer will save this value and the number of logs that must be read.
  • Page 40 CirPower Hyb 4k-48  Available power Note: This parameter is required in the Peak Shaving strategy; it does not have to be pro- grammed in all other strategies. This parameter is used to program the contracted power of the installation; with the Peak Shav- ing strategy, the unit compensates the consumption peaks above this value, provided that the energy available in the system (solar panels or battery) allows this to be performed.
  • Page 41 CirPower Hyb 4k-48 charged from the electrical network. Entering a time period allows the user to adapt the battery charge to the consumption profile of the dwelling, in order to benefit from the off-peak hours of the electrical tariff to keep the battery charged.
  • Page 42 CirPower Hyb 4k-48  C/10: Capacity (Ah), Battery capacity during discharge C/10.  C/10: V disch (V), Cut-off voltage during discharge C/10.  Cell Voltage: Float, Floating voltage of each cell.  Cell Voltage: Absorption, Absorption voltage of each cell.
  • Page 43 CirPower Hyb 4k-48 Step 9�- Select battery parameters Select battery parameters ( ). (See Figure 48 “7.1.7.- BATTERY MANAGEMENT” Figure 48:Battery parameters� SOC min. SOC value to enter into “empty battery” state and stop discharging the battery. SOC rec. SOC value to allow battery discharging, and disable “empty battery” status.
  • Page 44 CirPower Hyb 4k-48  Maximum charging current Note: This parameter is required if you have selected a Custom battery. The maximum charging current of the battery can be limited below the default values, according to the type of battery selected.
  • Page 45 CirPower Hyb 4k-48 Step 10�- Selection of the Date and Time Select the Time, Date and Time zone of the place where the unit is installed ( Figure 49 Figure 49: Date and time� If you enable the Internet Time option, the unit will be synchronised with the time of the Web server to which it is connected.
  • Page 46: 7�- Operation

    CirPower Hyb 4k-48 7�- OPERATION CirPower Hyb Hybrid inverter is an 4kW inverter for the power management. The integrated PC and RS-485 and Ethernet interface allows remote management of the de- vice. PV input connection, with MPPT algorithm, allow the connection of 2 PV panels strings. Includ- ed DC breaker and MC4 connectors reduce the installation costs, as no external elements are required.
  • Page 47: 7�1�- Definitions

    CirPower Hyb 4k-48 7.1.- DEFINITIONS 7�1�1�- MINIMUM/MAxIMUM START VOLTAGE, AND MINIMUM STOP CURRENT The minimum start voltage is the minimum voltage the inverter needs from the solar panel to start injection into the grid and/or batteries. The maximum start voltage is the voltage of the PV panels that cannot be exceeded to start injecting power into the grid and/or batteries.
  • Page 48: 7�1�6�- Rcmu Calibration (Residual Current Monitor Unit)

    CirPower Hyb 4k-48 Implemented anti-islanding uses passive methods to monitor the grid voltage and frequency. It uses as well active methods that react facing any grid failure, and stop and disconnect the inverter in the time regulated by the local standard.
  • Page 49 CirPower Hyb 4k-48 During the charge/discharge process, there is measurement uncertainty that produces a meas- urement mismatch that accumulates over time. The consequence is a different value between real SOC value and calculated SOC value. To solve that issue, the CirPower Hyb self-adjust the SOC to 100% when it detects that the battery is fully charged.
  • Page 50 CirPower Hyb 4k-48 Charge stages: Bulk Bulk charge is performed when the battery voltage is lower than the absorption voltage. During this stage, the goal of the inverter is to keep the charging current constant. This stage finishes when the battery reaches the absorption voltage.
  • Page 51: 7�1�8�- Standby Modes

    CirPower Hyb 4k-48 wise, battery capacity will be reduced due to battery components degradation. The type of battery charge is selected during the device start-up procedure (see “6.2.- START- Step 9.- Select battery parameters”) UP PROCEDURE : 7�1�7�4�- Battery management with an external BMS The device features a battery management system (BMS) for lead-based batteries.
  • Page 52 CirPower Hyb 4k-48 These standby modes have the following functions: Off 1, prevents unnecessary consumption from the AC network. If no AC network is available, it prevents the deep discharge of the battery. Off 2, prevents the deep discharge of the battery.
  • Page 53 CirPower Hyb 4k-48 7�1�8�2�- Installation without photovoltaic panels (Solar) Table 8: Standby modes (Type of installation: Without solar)� Type of installation Energy START/STOP management Battery SOC Direct keys Solar Battery strategy loads Grid Off 1 Off 2 Off 3 SOC = 0% See 7.2.1.- ENERGY MANAGEMENT STRATEGIES...
  • Page 54 CirPower Hyb 4k-48 7�1�8�3�- Installation without a battery Table 9: Standby modes (Type of installation: Without battery)� Type of installation Energy START/STOP management Direct keys Solar Battery strategy loads Grid Off 1 Off 2 Night See 7.2.1.- ENERGY MANAGEMENT STRATEGIES If a battery is not used, direct charging from an AC output is not required.
  • Page 55: 7�2�- Operating Principle

    CirPower Hyb 4k-48 7.2.- OPERATING PRINCIPLE CirPower Hyb Hybrid inverter work automatically and there is no need for user interaction. Dis- play shows inverter status, allowing the user to know which working mode is using the inverter at any time.
  • Page 56 CirPower Hyb 4k-48 Energy from solar panels will be used:  When loads are connected - To supply the loads. - If there is an excess, to charge the battery. - If battery does not allow further charging (SOC 100%), the PV generation is reduced.
  • Page 57 CirPower Hyb 4k-48 and will stay into that status until SOC passes “SOC Rec” value. The AC generation process will be stopped if the inverter is in the “Empty battery” status and the system detects that there is no surplus energy in the solar panels.
  • Page 58 CirPower Hyb 4k-48  If there is an excess, it will limit the solar generation. In case of grid failure, the supply of direct loads will depend on the status of the battery (SOC), and will have the same behaviour as described in the “Off-Grid” mode (“7.2.1.1.- Off-Grid”).
  • Page 59 CirPower Hyb 4k-48 A�- Power consumption > Contracted power Inverter Grid External power meter Battery Indirect loads Direct loads Figure 55:Energy management strategies: Peak Shaving� The energy supplied from the photovoltaic panels will be used:  To compensate the difference between consumed power and contracted power.
  • Page 60 CirPower Hyb 4k-48 C�- Power consumption < Contracted power Inverter Grid External power meter Battery Indirect loads Direct loads Figure 56:Energy management strategies: Peak Shaving� The energy supplied from the photovoltaic panels will be used: To charge the battery. To cancel consumption, if there is surplus energy.
  • Page 61 CirPower Hyb 4k-48 Inverter Grid >>> External power meter Battery Indirect loads Direct loads Figure 57:Energy management strategies: Backup� The energy supplied from the photovoltaic panels will be used:  To charge the battery.  If the battery is at full charge, it will cancel the consumption of all direct and indirect loads.
  • Page 62 CirPower Hyb 4k-48 Inverter Grid External power meter Battery Direct loads Indirect loads Figure 58: Energy management strategies: Auto backup� 7�2�1�7�- Summary of the strategies Strategies priority order when the CirPower Hyb is connected to the grid: Table 11: Strategies priority order when the CirPower Hyb is connected to the grid�...
  • Page 63 CirPower Hyb 4k-48 Table 11 (Continuation): Strategies priority order when the CirPower Hyb is connected to the grid� Strategies Priority order Other considerations 1� To charge the battery from the solar panels. 2� To charge the battery from the grid.
  • Page 64: 7�3�- Parallel Connections

    CirPower Hyb 4k-48 Strategies priority order when the CirPower Hyb has not the grid available: Table 12: Strategies priority order when the CirPower Hyb has not the grid available� Strategies Priority order Other considerations 1� To supply the direct loads from the solar panels.
  • Page 65 CirPower Hyb 4k-48  Via Ethernet, each device queries an external analyser via Ethernet (Modbus/TCP). Master Slave Slave RS-485 Ethernet Figure 60: Connection to different phases� Individually connected to the analyser via Ethernet�  Via RS-485, the master queries the external analyser via RS-485 (Modbus RTU) and the slaves receive the setpoints from the master.
  • Page 66: 7�4�- Display

    CirPower Hyb 4k-48 7.4.- DISPLAY A 3.5” TFT display is located at the front of the device, and shows the status, actual values and alarms or warning messages. Figure 62: Display� The display enters into power-saving mode 10 minutes after the last touch action. To power it on again, just touch the display.
  • Page 67: 7�4�2�- Central Area

    CirPower Hyb 4k-48 This zone shows :  Inverter status.  Keys , when required. Table 13: keys in upper area� Touch Starts the grid injection. Stops the grid injection. Restart the device after an alarm. 7�4�2�- CENTRAL AREA Upper area Central area Figure 65: Central area�...
  • Page 68: 8�- Display

    CirPower Hyb 4k-48 8�- DISPLAY Device display are accessed from the main screen, Figure 67 Figure 67:Main screen� Inverter main screen. Graph registers screen. Display values screen. Alarms register screen. Press gently over the keys to select the screen. Instruction Manual...
  • Page 69: 8�1�- Main Screen

    CirPower Hyb 4k-48 8.1.- MAIN SCREEN Main screen shows, at all times. Figure 68  Inverter status.  The energy management strategy selected.  The most important measurement parameters of the installation.  Daily energy delivered into the grid  Grid connection relay status.
  • Page 70: 8�1�2�- Keys

    CirPower Hyb 4k-48 Table 16: CirPower Hyb state message description� Message Description Calibration Performing sensors self-calibration Configuration Setting up internal components. Starting Performing start-up sequence and connection. Stopped Inverter stopped. Grid mode starting Inverter working connected to grid. Off-grid mode star- Inverter working off-grid.
  • Page 71: 8�2�- Graph Register

    CirPower Hyb 4k-48 8.2.- GRAPH REGISTER Graph register screen shows: the generated energy ( and power history Figure 69) (Figure 70) PV panels. 8�2�1�- DAILY GENERATED ENERGY REGISTER If you select the Energía (kWh) screen, a weekly graphic will be displayed, a 7 bar graph,...
  • Page 72: 8�2�2�- Generated Power Register

    CirPower Hyb 4k-48 8�2�2�- GENERATED POWER REGISTER Selection of Power (kW) shows the power generated during last 8 working hours, Figure 71 Figure 71: Generated power register (last 8 working hours)� Graph scale can be selected as absolute value (kW) or relative (%) to the nominal inverter pow- er.
  • Page 73 CirPower Hyb 4k-48 Table 17: Display values: Inverter (AC grid)� Parameter Units Grid voltage Grid current Active Power Frequency 8�3�1�2�- AC output parameters� Figure 73: Display values: Inverter (AC out)� Table 18:Display values: Inverter (AC out)� Parameter Units Output voltage...
  • Page 74: 8�3�2�- Battery

    CirPower Hyb 4k-48 Table 19:Display values: Inverter (PV)� Parameter Units PV voltage PV current PV power 8�3�1�4�- Temperature parameters Figure 75: Display values: Inverter (Temp)� Table 20: Display values: Inverter (Temp)� Parameter Units Heatsink temperature inv, heatsink temperature inverter ºC Heatsink temperature Chg 1, heatsink temperature charger 1.
  • Page 75: 8�3�3�- User

    CirPower Hyb 4k-48 Table 21: Display values ( Batt)� Parameter Units Vbat, Battery voltage Ibat, Battery current Pbat, Battery power SOC, State of charge Tª Bat, Battery temperature ºC If the battery has an external BMS, the messages from the BMS are displayed, Table 22 Table 22: Display values (Bat) with external BMS�...
  • Page 76: 8�3�4�- Inverter Information

    CirPower Hyb 4k-48 8�3�4�- INVERTER INFORMATION Touching the icon displays the , an inverter information screen. Figure 78 Figure 78: Inverter information screen� 8.4.- ALARMS AND WARNINGS REGISTER On this screen the alarms and warnings detected by the device are displayed.
  • Page 77 CirPower Hyb 4k-48 Description column shows a short description of the alarm. See Table 24� Start column shows the time gap since the alarm happened until now. Duration column is the time period the alarm has been active. Due to VDE-AR-N 4105:2011, last 5 alarms are recorded.
  • Page 78 CirPower Hyb 4k-48 Table 24 (Continuation): Alarm messages description� Alarms Leakage current Description Leakage current exceeds limit. Residual current monitor has detected a current higher than the maximum limit. High residual currents are an electrical safety hazard. Check the safety of the installation, both the PV panels side and the grid and AC- Actions Out side, and fix any insulation defect that are detected.
  • Page 79: 8�4�2�- Warnings

    CirPower Hyb 4k-48 Table 24 (Continuation): Alarm messages description� Alarms AC Output overload 10 Vac output min warnings were generated over a period of 1 hour while oper- Description ating in the isolated from grid mode. Requires manual rearming. Actions Reduces the direct load and/or battery charging consumption.
  • Page 80 CirPower Hyb 4k-48 Figure 80: Alarm register screen� Possible warnings messages are shown at Table 25 Table 25: Warnings messages description� Warnings Inv-1: Communication error Description If this warning remains activated, reboot the system. Contact Technical Service Inv-2: Vbus min...
  • Page 81 CirPower Hyb 4k-48 Tabla 25 (continuation): Warnings messages description� Warnings Inv-2000: High network voltage Description Grid voltage too high. Inv-4000: Awaiting mains connection Depending on the grid connection standard, the inverter will wait several minutes Description to connect to the grid. The grid must meet some voltage and frequency limits.
  • Page 82 CirPower Hyb 4k-48 Tabla 25 (continuation): Warnings messages description� Warnings Chg-200: Temp battery min Description Battery temperature too low. Temperature sensor disconnected/broken Chg-400: Charger Heatsink 1 temp min Description If this warning remains activated, reboot the system. Contact Technical Service...
  • Page 83: 9�- Setup

    CirPower Hyb 4k-48 9�- SETUP Press key to access the device’s configuration. Device has 3 different setup screens:  User interface setup screen.  Basic setup screen. Change of strategy 9.1.- USER INTERFACE SETUP Touching, , key shows the user interface setup screen, Figure 81 Figure 81: User interface setup screen�...
  • Page 84: 9�1�3�- Percentage Power Graph

    CirPower Hyb 4k-48 Figure 82: Calibrate touch sensor� Note: it you have accessed accidentally the calibration screen , waits until the middle circle surrounding line is completed, and it will go back to the setup screen automatically. ( Figure 81 9�1�3�- PERCENTAGE POWER GRAPH...
  • Page 85: 9�2�- Basic Setup

    CirPower Hyb 4k-48 9.2.- BASIC SETUP Basic setup screen is password protected. To get access, press the key , for 10 seconds, at the user interface setup screen ( Figure 81 Numeric keypad screen ( is displayed to insert the password.
  • Page 86: 9�2�2�-Pv

    CirPower Hyb 4k-48 Maximum value : 250 V. 9�2�1�2�- Max Vdc MPPT sweep Maximum solar panel voltage of the MPPT range. To modify the value, touch the value, the keypad appears ( ), and the new value can Figure 83 be typed in.
  • Page 87: 9�2�3�- Ethernet

    CirPower Hyb 4k-48 9�2�2�2�- Min current Stop Minimum solar panel current required to inject into the grid. To modify the value, touch the value, the keypad appear ( ), and the new value can Figure 83 be typed in. Minimum value : 0.1 A.
  • Page 88: 9�2�4�- Bat

    CirPower Hyb 4k-48 9�2�4�- BAT On this tab, , you can do the following: Figure 87 Figure 87: Basic setup (Bat)  Full battery charging You can fully charge the battery manually by pressing the Start key. During charging, the screen displays the status of the process and, once finished, the Cirpower Hyb returns to the automatically defined operating mode.
  • Page 89 CirPower Hyb 4k-48 Figure 88: Basic setup (Calibration in progress) The real capacity of the battery ( ) will be shown when the calibration process is com- Figure 79 plete. Press Ok to return to the basic setup screen. Figure 89: Basic setup (Calibration complete) Cirpower Hyb will return to the operating mode that has been automatically defined after the battery calibration process is complete.
  • Page 90: 9�3�- Change Of Strategy

    CirPower Hyb 4k-48 9.3.- CHANGE OF STRATEGY Change of strategy may cause the non-compliancy of the local grid connection regulations. Change of strategy screen is password protected. To get access, press the key , for 10 seconds, at the user interface setup screen ( Figure 90 Figure 90: Access to change strategy�...
  • Page 91: 9�4�- Factory Reset

    CirPower Hyb 4k-48 9.4.- FACTORY RESET It is possible to reset the setup to the factory defaults. To get access, press the key , for 10 seconds, at the user interface setup screen ( Figure 90 Numeric keypad screen ( is displayed to insert the password.
  • Page 92: 10�- Communications

    CirPower Hyb 4k-48 10�- COMMUNICATIONS 10.1.- RS-485 COMMUNICATION The unit can communicate via Modbus (RS-485), as the master, with:  An external meter, to read the active power of the installation. The external meter is used in energy management strategies Automatic and Self-consump- tion.
  • Page 93: 10�1�2�- Modbus Memory Map

    CirPower Hyb 4k-48 In the RTU mode, the message start and end are detected with silences of at least 3.5 characters, and the 16-bit CRC error-detection method is used. The MODBUS functions implemented in the unit are: Function 0x04� Reading logs.
  • Page 94 CirPower Hyb 4k-48 Tabla 29 (continuation):Modbus memory map: Configuration variables (Solar converter)� Solar converter Configuration variable Address Valid data margin Default value Minimum stop current 006A 0�1- 1�0 A 170 - 250 V Minimum injection voltage 00A5 Photovoltaic waiting time...
  • Page 95 CirPower Hyb 4k-48 Table 32:Modbus memory map: Display variables (3) Solar panel variables Display variable Address Units Solar panel voltage 0294 V (1 decimal) Solar panel current 0295 A (2 decimals) Solar panel power 0296 Solar converter energy 0297 kWh (2 decimals)
  • Page 96: 10�2�- Ethernet Communications

    CirPower Hyb 4k-48 Table 36:Modbus memory map: Display variables (7) Display variable Address Units Power value read by the external analyzer 0321 Days since the last full charge 0322 days 10.2.- ETHERNET COMMUNICATIONS The device can communicate via Modbus (Ethernet), as the master, with: ...
  • Page 97: 11�- Technical Features

    CirPower Hyb 4k-48 11�- TECHNICAL FEATURES PV input Input voltage 150... 700 V Standby input voltage 150 V Maximum input current 20 A Shortcircuit current 20 A Maximum DC power (cos φ = 1) 4250 W @ 35ºC Minimum/Maximum start voltage...
  • Page 98 CirPower Hyb 4k-48 General specifications Standby consumption < 0.5W Transformerless Topology Ethernet communications Connector RJ-45 Network protocol TCP/ IP Modbus communications RS-485 Protocol Modbus RTU Baud rate 9600 - 19200 Stop bits 1 - 2 Parity none - even - odd...
  • Page 99 CirPower Hyb 4k-48 Standards Safety of power converters for use in photovoltaic power systems EN62109-1: 2011 -- Part 1: General requirements Safety of power converters for use in photovoltaic power systems - EN62109-2 : 2013 Part 2: Particular requirements for inverters...
  • Page 100: 12�- Maintenance And Technical Service

    • CIRCUTOR accepts no liability due to the possible damage to the unit or other parts of the installation, nor will it cover any possible sanctions derived from a pos- sible failure, improper installation or “improper usage”...
  • Page 101: 14�- Ce Certificate

    CirPower Hyb 4k-48 14�- CE CERTIFICATE Instruction Manual...
  • Page 102 CIRCUTOR, SA Vial Sant Jordi, s/n 08232 - Viladecavalls (Barcelona) Tel: (+34) 93 745 29 00 - Fax: (+34) 93 745 29 14 www.circutor.es central@circutor.com...