Utile L95HP Installation, Operation & Maintenance Instructions Manual

Gas compressor

Advertisement

Installation
Operation

Maintenance Instructions

Model L95HP – L175HP
Gas Compressor
Serial Number
Site Location
Installation Date
GAS COMPRESSORS / BOOSTERS  GAS & AIR MIXING SYSTEMS  AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd.
Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: sales@utileengineering.com
www.utileengineering.com
1
IC182

Advertisement

Table of Contents
loading

Summary of Contents for Utile L95HP

  • Page 1: Maintenance Instructions

    Installation Operation Maintenance Instructions Model L95HP – L175HP Gas Compressor Serial Number Site Location Installation Date GAS COMPRESSORS / BOOSTERS  GAS & AIR MIXING SYSTEMS  AIR BLOWERS & VACUUM PUMPS The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: sales@utileengineering.com...
  • Page 2: Table Of Contents

    GAS COMPRESSORS / BOOSTERS  GAS & AIR MIXING SYSTEMS  AIR BLOWERS & VACUUM PUMPS The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: sales@utileengineering.com www.utileengineering.com...
  • Page 3: General

    Discharge GAS COMPRESSORS / BOOSTERS  GAS & AIR MIXING SYSTEMS  AIR BLOWERS & VACUUM PUMPS The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: sales@utileengineering.com www.utileengineering.com...
  • Page 4: Health And Safety

    If there are any doubts or ambiguities concerning correct procedures, ask Utile Engineering. DO NOT TAKE RISKS. Certain machinery can generate high levels of noise which can be harmful if exposed to it for lengthy periods of time.
  • Page 5: Technical Specification

    88 - 92 88 - 92 Weight Note: Machine must not be used on any other gas than originally specified. Utile Engineering must be consulted if traces of any other gas are introduced into the machine. Packaging The packaging conforms to the relevant regulations. The symbols used on the packages are shown on the right.
  • Page 6: Handling

    Before commencing installation, a site specific risk assessment, method statement and hazard identification list must be completed and adhered to. All work must be carried out in a safe area. Utile Engineering trained personnel or those trained to an equivalent standard should carry out installation, any claims for damage due to faulty installation will be void. The machine is delivered ready to be connected, with only the removal of the intake and discharge protection covers.
  • Page 7 Belts, which become charged electrostatically, must not be used in hazardous atmospheres. GAS COMPRESSORS / BOOSTERS  GAS & AIR MIXING SYSTEMS  AIR BLOWERS & VACUUM PUMPS The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: sales@utileengineering.com www.utileengineering.com...
  • Page 8: Pre Start-Up Checks

    Check all protective devices and controls making sure they are working correctly. GAS COMPRESSORS / BOOSTERS  GAS & AIR MIXING SYSTEMS  AIR BLOWERS & VACUUM PUMPS The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: sales@utileengineering.com www.utileengineering.com...
  • Page 9: Operating Notes

    (oil pump to machine) and start up. GAS COMPRESSORS / BOOSTERS  GAS & AIR MIXING SYSTEMS  AIR BLOWERS & VACUUM PUMPS The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: sales@utileengineering.com www.utileengineering.com...
  • Page 10: Maintenance

    Maintenance Maintenance Fully trained and competent staff must carry out any maintenance work. Utile Engineering offers contract maintenance services if required contact our service department. When carrying out any maintenance and inspections always follow the health and safety guidelines on page 4.
  • Page 11: Troubleshooting

    GAS COMPRESSORS / BOOSTERS  GAS & AIR MIXING SYSTEMS  AIR BLOWERS & VACUUM PUMPS The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: sales@utileengineering.com www.utileengineering.com...
  • Page 12: Blade Inspection

    If there is any sign of cylinder rubbing completely dismantle the machine. Factory reconditioning is recommended, but if work has to be carried out on site, we advise you most strongly to contact Utile Engineering Service Department for advice.
  • Page 13: Change Bearings And Seals

    Check rotor / cylinder clearance. GAS COMPRESSORS / BOOSTERS  GAS & AIR MIXING SYSTEMS  AIR BLOWERS & VACUUM PUMPS The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: sales@utileengineering.com www.utileengineering.com...
  • Page 14: Spare Parts

    Contact the address or telephone number shown at the bottom of each page or our local distributor, for any after sales service, maintenance or service problems. Contract maintenance, service exchange machines or a site visit by a Utile Engineering Service Engineer can also be arranged in the same manner.
  • Page 15: Spare Parts List

    P 1023 GAS COMPRESSORS / BOOSTERS  GAS & AIR MIXING SYSTEMS  AIR BLOWERS & VACUUM PUMPS The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: sales@utileengineering.com www.utileengineering.com...
  • Page 16: Warranty

    Warranty Warranty Claim Conditions Utile offers a 12-month warranty against faulty parts and workmanship. This does not include components used in the production of packages, where the appropriate manufacturers warranty applies. The warranty period commences from the first day that the operator receives the machine.

This manual is also suitable for:

L175hp

Table of Contents