Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Table of contents Assembly Instructions ..........................1 Introduction installation.........................4 Data sheet ...............................6 Scope of supply, parts list with part numbers ..................8 Assembly instructions .........................12 ...
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Introduction installation General information This equipment should be installed, inspected, maintained and operated in ac- cordance with EN1176-7 guidelines. Before installation work commences, please check that you have all of the equipment and fixation components in the parts list provided (see Tables 3-1 and 3-2).
Page 5
Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Drawings / Views All optical illustrations simply demonstrate the proportions/dimensions to be followed, but are not binding, technical equipment images. Technical modifications supporting the advancement of our articles are ...
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Data sheet: Easy- Swing Maxi & Midi 1. Space required: 3,00 m x 0,60 m (4591-50-1 and 4591-50-2) resp. 2,80 m x 7,40 m includ- ing safety distance (see top view) Height of fall: 1,30 m each 2.
Page 7
Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net 7. We hereby confirm that this item of play equipment has been tested and certified in accordance with the play equipment standard EN 1176. \\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc...
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Scope of supply, parts list with part numbers In letters Table 3-1: Scope of supply, parts list with part numbers Pos. Quantity Element / Size O.K. Missing description VARIO-element, part no.
Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net In symbols Table 3-2: Scope of supply, in symbols Quantity Pos. Symbol Ø 102 mm - 3,00 m long for Ø 102 mm für Ø 102 mm (VO) for Ø 102 mm Part no.
Page 10
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net (Part no. 4591-50-2) 5,5 x 25 mm Loctite 3 ml. (per bottle) (thread locking) Support slab (e.g. sidewalk slab) (To be provided by customer – not included in scope of supply!)
Page 11
Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Abbreviations and signs: Setting time for concrete C25/30 at least 7-8 days Dimension between axes (centre-centre) post Clear post dimension Concrete C25/30 (for foundation) Top view / outlineß Fall protection Radius of upper edge of foundation at least 10 cm Gehw.
Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Examination after installation If the equipment is not installed in a secure manner you must ensure that access is closed to the public! Marking the filling level • Markings on the equipment to indicate filling levels of fall protection material (for example of loose filling material).
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Introduction Maintenance General information This equipment should be installed, inspected, maintained and operated in ac- cordance with EN 1176-7 guidelines. Please note: Providing any necessary repairs are carried out, a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net General maintenance information Maintenance intervals Maintenance intervals are based on average use. Please note that more fre- quent inspections and/or maintenance are required if the play equipment is subject to intensive use.
Page 22
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Faults Damages must be repaired as soon as they are detected. If serious de- fects that affect the safety cannot be repaired straight away, the play- ground item must be closed to the public with immediate effect.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Regular maintenance (Text) m = monthly ¼ j = quarterly ½ y = half-yearly ¼ ½ Check the ground surface of fall protection for hard objects and loose foundations.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Maintenance Timetable Special advices Maintenance interval We strongly advise to carry out inspections and maintenance work within the specified periods as use of the equipment, the weather and malicious vandal- ism cause wear and tear that compromises the safety and function of the equipment.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Monthly Maintenance • Check the spaces between the equipment and the ground (clearance and height of fall). • Check the ground surface of fall protection for hard objects and loose foundations.
The equipment must be inspected by someone with the necessary ex- pertise in strict compliance with the instructions issued by Huck Seiltech- nik GmbH. A copy of the inspection record should be given to the operator, who must confirm receipt.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Hand Over Document After the installation of the equipment, the installation and maintenance documents are to be handed over to the operator. The operator has to have the documents signed. The complete filled and signed hand over documents are to be sent back to the supplier! Part no.:...