8P - 10
SPEED CONTROL
VACUUM RESERVOIR (Continued)
Fig. 11 VACUUM RESERVOIR REMOVAL /
INSTALLATION
1 - COWL (BELOW WIPER ARMS)
2 - VACUUM LINE CONNECTION
3 - MOUNTING NUTS (2)
4 - VACUUM RESERVOIR
5 - WELDED STUDS
INSTALLATION
(1) Position reservoir onto 2 weld studs (Fig. 11).
(2) Install 2 mounting nuts and tighten. Refer to
torque specifications.
(3) Connect vacuum line to reservoir fitting.
(4) Install cowl grill. Refer to Cowl Grill Removal /
Installation.
(5) Install wiper arms / blades. Refer to Wiper Arm
Removal / Installation.
DR
Need help?
Do you have a question about the RAM 1500 1998 and is the answer not in the manual?