Maintenance; Maintenance Schedule; Clean Entire System; Tighten Nuts And Bolts - Echo QV-670 Instruction Manual

Quickvent system
Hide thumbs Also See for QV-670:
Table of Contents

Advertisement

MAINTENANCE SCHEDULE

REQUIRED
CARE
Inspect Chain

CLEAN ENTIRE SYSTEM

(After Each Use)
1. Clean bar and chain with a 50 - 50 mixture of
kerosene and machine oil.
2. Remove the guide bar and clean the clutch and
brake mechanism with a 50 - 50 mixture of
kerosene and machine oil.
3. Clean the exterior of the saw with a non-
flammable solvent.

TIGHTEN NUTS AND BOLTS

(After Each Use)
1. Make sure all fasteners on the saw are tight.
2. Replace those found to be faulty.

MAINTENANCE

AFTER
AS
EACH USE
NEEDED
15
WEEKLY
60 DAYS
EVERY
PAGE
NO.
12
12
13
----
13
13
14
15
15
16
16
17
17
17
17
18
18
19
19

Advertisement

Table of Contents
loading

Table of Contents