Young America Built to Grow Lyric BTG 2300 Assembly Instructions Manual

Young America Built to Grow Lyric BTG 2300 Assembly Instructions Manual

Maximum weight 50lb(22.7kg)

Advertisement

Built to Grow Crib Assembly Instructions
IMPORTANT - RETAIN FOR FUTURE REFERENCE - READ CAREFULLY
Model :
BTG 2300
BTG 2400
Proper assembly will ensure every effort has been made to design this crib with
your baby's safety in mind. It is certified to meet all safety guidelines established
by ASTM International and the CPSC-Consumer Product Safety Commission.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Built to Grow Lyric BTG 2300 and is the answer not in the manual?

Questions and answers

Summary of Contents for Young America Built to Grow Lyric BTG 2300

  • Page 1 Built to Grow Crib Assembly Instructions IMPORTANT - RETAIN FOR FUTURE REFERENCE - READ CAREFULLY Model : BTG 2300 BTG 2400 Proper assembly will ensure every effort has been made to design this crib with your baby's safety in mind. It is certified to meet all safety guidelines established by ASTM International and the CPSC-Consumer Product Safety Commission.
  • Page 3 Identifying the Parts The crib illustrations in these instructions are generic in nature. The crib you have purchased may not look like the ones illustrated; however, they all assemble in the same manner. Mattress Platform Left Crib End Right Crib End Headboard Footboard...
  • Page 4 Identifying the Hardware Identify the hardware included using the illustrations below 12 Connector Bolts 2 3/8” (1/4” x 20 thread) 2 Metal Locator Pins 3/8” diameter x 1 1/2” long 4 Mattress Brackets with Bolts 2 Allen Wrenches 6 Hole Bolts (3/4” x 1/4” x 20 thread) This hardware is for use when converting to a day bed and a full size bed.
  • Page 5 Crib Assembly NOTE: Read all instructions before assembling crib. KEEP INSTRUCTIONS FOR FUTURE REFERENCE. Attached to the mattress platform is a sleeve to store the instruction booklet. After assembly is complete, return this instruction booklet to the sleeve for future reference.
  • Page 6 Attaching the Mattress Platform Brackets Make sure the brackets are straight and Step 1: Locate the (4) Mattress Platform Brackets with perpendicular to the crib uprights. attached assembly bolts as shown in Fig. 1. De- When child is able to pull to a standing termine the high or low position of the mattress position, set the mattress platform to the foundation (Fig.
  • Page 7 Attaching the End Sections See Figure 5. Step 2: Insert bolts and Insert the (2) metal locator pins in tighten from in- the lower hole of the head board side the Crib Ends post as shown in Fig 4a. Support the headboard and attach one end section to the headboard by aligning the metal locator pin in the headboard with the bottom...
  • Page 8 Attaching the Mattress Platform Step 3: Place the mattress platform into the support brackets. (Before inserting bolts, make sure the instruction holder and the warning label are facing up and readable as shown in Fig After the mattress platform is in place, use (4) 2 3/8”...
  • Page 9 Attaching the Footboard Step 4: Align the footboard with the end sections. Using (4) 2 3/8” connector bolts, loosely attach the foot- board as indicated in Fig 9. After the bolts have been at- tached, use the wrench pro- vided to tighten each of the bolts to secure the footboard.
  • Page 10 Final Step in Crib Assembly Step 5: (The final and most important) Checklist. Inspect the crib once again to assure that all bolts are tight and that no hardware is missing. (if you have missing hardware, contact Stanley Furniture immediately for replacement and do not use the crib until the new hardware arrives).
  • Page 11 Cleaning: Mix together a mild solution of gentle dishwashing liquid and water, apply to the crib sur- face using a soft clean cloth lightly dampened in the solution. Rinse with clear water again using a soft clean cloth, then dry all surfaces thoroughly with a dry cloth. NO ABRASIVE CLEANERS, SCOURING PADS, STEEL WOOL OR COURSE RAGS SHOULD BE USED TO CLEAN THIS FINE FURNITURE.
  • Page 12 Lowering the Mattress Platform Steps to lower the mattress: Remove the mattress from the crib Loosen the (4) bolts attaching the footboard and remove the footboard. See Figure 12. Loosen the (4) bolts attaching the Mattress Platform and remove the platform from the crib. Note the bolts will stay with the Mattress Platform.
  • Page 13 Converting Your Crib to a Daybed Steps to Convert Crib to a Daybed: Step A: The mattress should be in the low position. Follow the instruc- tions on page 12 for lowering the Mattress Platform. Do not reattach the footboard. Step B: Remove the (4) Bolts located in the End Frames: Locate the (4) 2 3/8”...
  • Page 14 Accessories and Options Toddler Bed Conversion Kit item BTK-3230 is available as an option to convert the Built to Grow Crib to a toddler or day bed. Contact your oung America to purchase this k . Safety Rails for a Full Size Bed item PSR-3268 are available for added safety when the bed is converted to a full size bed.
  • Page 15 Converting to a Full Size Bed Step 1: Disassemble the crib or toddler/day bed. Using the wrench provided remove the components in the following order: Remove the footboard Remove the mattress platform Remove the crib ends from the crib headboard Keep and store all the hardware for future assembly of the crib.
  • Page 16 Stanley F u r n i t u r e Stanley Furniture Company 200 North Hamilton St High Point, NC 27260 parts, contact your our Customer Service 800 659-7297 Mon.-Fri. 8am-5pm...

This manual is also suitable for:

Built to grow sleigh btg 2400

Table of Contents