Fore Mast Assembly; Main Mast Assembly; Mizzen Mast Assembly - REVELL Golden Hind Assebly Instructions

Table of Contents

Advertisement

H-325-380
1[;-----103
11-"::....---120
'l.V----102
~-
ITff
l
,{
BLACK
THREAD
IIlACK
THREAD
119----1
117
100--.-..r
109-----1
98
----I,.j,
IllI!----
99
LASHING
DIAGRAM
LASHING.
oaAIRAM
::(
MAIN MAST ASSEMBLY
L Cement Parts 109 and 110
together.
Assemble
and
cement
Main Mast and
Parts
111,
112,
113,
114,
and one Part
104.
2.
Refer
to
LASHING DIAGRAM and lash Masts together
with
blackened
rigging
thread.
3.
Cement together
Parts 115 and 116, Parts 117 and
118,
and cement each
assembly into place
on
Main
Top.
4.
Cement Ratlines L-2 and R-2 into position.
FORE MAST ASSEMBLY
1.
Cement
Parts
98 and 99
together.
Assemble
and
cement Fore Mast and
Parts 100,
101, 102, 103, and
one
Part
104.
2.
Refer to LASHING DIAGRAM and lash Masts together
with blackened rigging
thread.
3.
Cement together
Parts
105
and 106. Parts
107 and
108,
and cement each assembly
into
place on Fore
top.
4. Cement Ratlines L-1
and R-1 into place as
shown.
MIZZEN
MAST ASSEMBLY
1.
Assemble
and cement
Parts
119, 120 and one Part
104. Cement one Part 30
to
Mizzen Mast as shown.
2. Lash Masts together,
as
shown,
with blackened
rig-
ging
thread.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents