Download Print this page

Fleck 3200ET Service Manual

Remote meter
Hide thumbs Also See for 3200ET:

Advertisement

Quick Links

3200ET Remote Meter

Service Manual

IMPORTANT: Fill in pertinent information on page 2 for future reference.

Advertisement

loading

Summary of Contents for Fleck 3200ET

  • Page 1: Service Manual

    3200ET Remote Meter Service Manual IMPORTANT: Fill in pertinent information on page 2 for future reference.
  • Page 2: Installation And Start-Up Procedures

    3200ET Remote Meter Installation and Start-Up Procedures Record Remote Meter Programming Here: Water Hardness ___________________________________________ System Capacity ___________________________________________ Regeneration Time ___________________________________________ Regeneration Signal Time ___________________________________________ Notes: ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ 1. Follow the installation procedures contained within the remote meter service manual.
  • Page 3 3200ET Remote Meter Installation and Start-Up Procedures (Cont’d.) Figure #1 7. In normal operation the Time Of Day, and if flow meter equipped, Volume Remaining Displays alternate being viewed. Set the Time Of Day Display by depressing the Up or Down Set Button to the correct time. (See Fig. 1) For Example: 12:59 A.M.
  • Page 4 3200ET Remote Meter Installation and Start-Up Procedures (Cont’d.) 9. Manually initiate a regeneration cycle of all valves in the system through the remote timer. Allow water to run to drain on each valve for 3 to 4 minutes. Manually step each valve through a complete regeneration cycle checking valve operation in each step.
  • Page 5: Control Operation

    3200ET Remote Meter Control Operation Normal Operation Remote Meter Delayed Regeneration Systems - In Normal Operation the Time Of Day Display will alternate being viewed with the Volume Remaining Display. Water flow through the unit is indicated by the Meter Arrow that will flash in a direct relationship to flow rate. As treated water is used, the Volume Remaining Display will count down from a maximum value to the calculated reserve capacity.
  • Page 6 3200ET Remote Meter Control Operation (Cont’d.) Timeclock Regeneration Systems - In Normal Operation the Time Of Day Display will be viewed at all times. The control will operate normally until the days since the last regeneration reaches the preset number of days. Once this occurs, a regeneration cycle will then be initiated immediately at the preset Regeneration Time.
  • Page 7 3200ET Remote Meter Control Operation (Cont’d.) Control Operation During A Power Failure During a power failure all control displays will be turned off and regeneration cycles delayed. The control will otherwise continue to operate normally until line power is restored or battery backup power is lost.
  • Page 8 3200ET Remote Meter Control Operation (Cont’d.) Operation During Programming The control will only enter the Program Mode with the timer in Service and operating on line power. While in the Program Mode the control will continue to operate normally monitoring water usage and keeping all displays up to date.
  • Page 9 3200ET Remote Meter Timer Wiring Diagram Standard Remote Meter Wring 2900/3900 Multivalve System #7 Remote Meter Wiring Page 9 Printed in U.S.A.
  • Page 10 3200ET Remote Meter 3200ET Timer Assemblies (See opposite page for parts list) Page 10 Printed in U.S.A.
  • Page 11: Parts List

    1... 1 ... 19144-01 ... . .