Installation In Existing Construction - NuTone 9960-R03 Installation Instructions Manual

Heat-light combination (with night light)
Table of Contents

Advertisement

INSTALLATION IN
EXISTING CONSTRUCTION
In an existing, finished building, installation of the Heat-
Light Combination requires an accessible area (attic or crawl
space) above the planned location. If the location that has
been chosen for installation has a finished floor above it,
be certain there is sufficient space available to install the
housing.
PLANNING
Review "INSTALLATION IN NEW CONSTRUCTION" and
follow all instructions that apply.
CAUTION: Check the area above the planned location
to make sure that:
(1) Wiring can be run to the planned location.
(2) No wiring or other obstructions might interfere with
the installation.
INSTALLATION
1. The housing must be mounted between ceiling joists.
2. Refer to Figure 10. Mark ceiling for cutout. Cutout
1
dimensions: 14
" long x 9
8
3. Follow steps under "PREPARATION" page 1.
4. From above, lower housing into the cutout and secure
hanger brackets. Run wiring through box connectors.
5. From below, adjust housing so that it is flush with the
finished ceiling.
6. Form below, make wiring connections as shown in figure 6.
7. Replace junction box cover.
8. Insert heater, light, and night light plugs into proper
receptacles.
9. Install grille, reflector and lens.
7
" wide. Make cutout in ceiling.
8
5
1
14
"
8
7
9
"
8
FIGURE 10

Advertisement

Table of Contents
loading

Table of Contents