PLACEMENT CONSIDERATIONS
Indoor Unit Clearance/Outdoor Unit Installation
Indoor Unit Best Location
Follow recommended best practices when choosing an indoor location for the
single zone indoor unit.
• Use a metal detector to locate studs in the walls. Anchor unit following stud
location, to prevent damage to the wall.
• Clearance gap between any wall or enclosure and the left or right side of the
unit must be greater than 4 inches (Figure 12).
to the ceiling.
• Keep unit away from any indoor steam or excessive heat.
• No obstacles should be placed around unit.
• Condensation drain (leakage piping) should be routed away from the unit.
• Do not install near doorway.
General Mounting for Outdoor Units
Securely attach the outdoor unit to a condenser pad, base rails, or
another mounting platform that is securely anchored to the ground
or building structure. Attach the outdoor unit with a bolt and nut on
a concrete or rigid mount. See Figure 13. Refer to the applicable
installation manual and follow applicable local codes for clearance,
mounting, anchor and vibration attenuation requirements.
to scale.
Mounting Platform
The underlying structure or foundation must be designed to sup-
port the weight of the unit. Avoid placing the unit in a low lying area
where water may accumulate. When installing the outdoor unit on
the wall, or roof top, anchor the mounting base securely to account
for wind, earthquake or vibration.
Tie-Downs and Wind Restraints
The strength of the Duct-free Split Single Zone Inverter system
frame is adequate to be used with field-provided wind restraint tie-
downs. The overall tie-down configuration must be approved by a
local professional engineer.
Always refer to local code when designing a wind restraint system.
Snow and Ice Conditions
In climates that experience snow build-up, place the unit on a raised platform to ensure condenser airflow. The raised support platform must
be high enough to allow the unit to remain above possible snow drifts. Mount the unit on a field-provided snow stand at a minimum height
that is equal to the average annual snowfall plus 20 inches. Design the mounting base to prevent snow accumulation on the platform in front
or back of the unit case. If necessary, provide a field fabricated hood to keep snow and ice and/or drifting snow from accumulating on the coil
surfaces. Use inlet and discharge duct or hoods to prevent snow or rain from accumulating on the fan inlet and outlet guards. Best practice
prevents snow from accumulating on top of the unit. Consider tie-down requirements in case of high winds or where required by local codes.
CAUTION
When deciding on a location to place the outdoor unit, be sure to choose an area where run-off from defrost will not accumulate and freeze on
sidewalks or driveways which may create unsafe conditions.
42 | APPLICATION GUIDELINES
©
Figure 12: Single Zone Indoor Unit Clearance Requirements.
More than 4 inches
At least 6.5 feet from the floor
Table 19: Indoor Unit Ceiling Clearance.
"A" Ceiling Clearance (inches)
5
8
Figure 13: Outdoor Unit Mounting Methods.
Bolt
Placement
& Anti-Vibration
Pad
Foundation
Minimum clearance
from ceiling - "A"
More than
4 inches
Indoor Unit Model(s)
LAN090HSV4, LAN120HSV4
LAN180HSV4, LAN240HSV3
Top of Unit
Piping Connection