Table Of Contents - Wolf Steel 13 SEER Installation Instructions Manual

Table of Contents

Advertisement

2

TABLE OF CONTENTS

1.0 SAFETY..................................................................................................................3
1.1 INSPECTION....................................................................................................4
1.2 LIMITATIONS....................................................................................................4
2.0 GENERAL..............................................................................................................4
3.0 UNIT INSTALLATION............................................................................................6
3.1 LOCATION.......................................................................................................6
3.2 GROUND INSTALLATION...............................................................................6
3.3 ROOF INSTALLATION.....................................................................................6
3.4 UNIT PLACEMENT..........................................................................................6
3.5 UNIT MOUNTING............................................................................................7
3.6 FACTORY-PREFERRED TIE-DOWN METHOD.............................................8
3.7 PRECAUTIONS DURING LINE INSTALLATION.............................................9
3.8 PRECAUTIONS DURING BRAZING OF LINES.............................................10
3.9 PRECAUTIONS DURING BRAZING SERVICE VALVE.................................10
4.0 INTERCONNECTING TUBING............................................................................12
4.1 SUCTION AND LIQUID LINES .....................................................................12
4.2 MAXIMUM LENGTH OF LINES ....................................................................12
4.3 VERTICAL LIFT ............................................................................................12
5.0 EVACUATION......................................................................................................12
6.0 ELECTRICAL CONNECTIONS...........................................................................14
6.1 GENERAL INFORMATION & GROUNDING .................................................14
6.2 FIELD CONNECTIONS POWER WIRING ....................................................14
6.3 REMOVING THE TOP PANEL AND MOTOR................................................15
7.0 CHECKING REFRIGERANT CHARGE ..............................................................15
7.1 CHARGING BY LIQUID PRESSURE............................................................15
7.2 CHARGING BY WEIGHT ..............................................................................16
7.3 FINAL LEAK TESTING .................................................................................16
8.0 WARRANTY.........................................................................................................16
9.0 WIRING DIAGRAM..............................................................................................17

Advertisement

Table of Contents
loading

Table of Contents