Remove The C2-Board; Remove The Front Bracket - Panasonic TH-42PZ80U Service Manual

Hide thumbs Also See for TH-42PZ80U:
Table of Contents

Advertisement

7.15. Remove the C2-Board

1. Remove the A-Board unit. (See section 7.6.)
2. Remove the stand bracket R. (See section 7.12.)
3. Remove the screws (×3
mount metal.
4. Remove the DD-Heat-sink holder fastening screws
(×14
).
5. Remove the DD-Heat-sink (×7).
6. Disconnect the flexible cables (CB9, CB10, CB11, CB12,
CB13, CB14 and CB15).
7. Disconnect the flexible cables (C20 and C21).
8. Disconnect the connectors (C23 and C25).
9. Remove the screws (×5
) and Remove the Cabinet
) and remove the C2-Board.

7.16. Remove the Front bracket

1. Unlock the cable clampers to free the cable.
2. Disconnect the connectors (A11, A51 and A52). (See sec-
tion 7.6.)
3. Remove the screws (×2
Front bracket.
7.17. Remove
Board and GH-Board
1. Remove the Front bracket. (See section 7.16.)
2. Remove the screws (×2
3. Remove the screws (×3
4. Remove the Front shield case front.
5. Disconnect the connectors (GH11 and GS52).
6. Remove the screws (×2
7. Remove the Front shield top.
8. Remove the GH-Board.
9. Remove the screws (×2
10. Remove the screws (×3
21
, ×2
) and remove the
the
G-Board,
).
).
).
) and remove the GS-Board.
).
GS-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents