b. Items to be checked at time of delivery
Items to be checked
Did you explain about operations while showing the
operation manual to your customer?
Did you hand the operation manual and warranty over to
your customer?
Did you explain about the way of maintaining and cleaning
local procurements (air filter, grille (both air outlet and suc-
tion grille), etc.) to your customer?
Did you hand manuals of local procurements (in case
equipped) over to your customer?
c. Points for explanation about operations
The items with
WARNING and
the operation manual are the items pertaining to possibili-
ties for bodily injury and material damage in addition to the
general usage of the product. Accordingly, it is necessary
that you make a full explanation about the described con-
tents and also ask your customers to read the operation
manual.
3.

SELECTING INSTALLATION SITE

CAUTION
• When moving the unit during or after unpacking, make sure
to lift it by holding its lifting lugs. Do not exert any pressure on
other parts, especially the refrigerant piping, drain piping and
flange parts.
• If you think the humidity inside the ceiling might exceed
30°C and RH80%, reinforce the insulation on the unit body.
Use glass wool or polyethylene foam as insulation so that
the thickness is more than 10mm and fits inside the ceiling
opening.
(1) Select an installation site where the following condi-
tions are fulfilled and that meets with your customer's
approval.
• Where optimum air distribution can be ensured.
• Where nothing blocks air passage.
• Where condensate can be properly drained.
• Where the ceiling is strong enough to bear the indoor unit
weight.
• Where the false ceiling is not noticeably on an incline.
• Where there is no risk of flammable gas leakage.
• Where sufficient clearance for maintenance and service
can be ensured. (Refer to Fig. 1)
English
Check
CAUTION marks in
4.
• Where piping between indoor and outdoor units is possi-
ble within the allowable limit. (Refer to the installation
manual for the outdoor unit.)
*300
or
more
Control box
Maintenance
space
20 or more
Fig. 1
• *H dimension means the minimum height of the unit.
• Select the *H dimension such that a downward slope of at
least 1/100 is ensured as indicated in "7. DRAIN PIPING
WORK".
• The maintenance space marked with "*" is required when
the installation box for adaptor PC board (KRP1BA101)
sold separately is used.
[ PRECAUTION ]
• Install the indoor and outdoor units, power supply wiring
and connecting wires at least 1 m away from televisions
or radios in order to prevent image interference or noise.
(Depending on the radio waves, a distance of 1 m may
not be sufficient enough to eliminate the noise.)
• If installing the wireless kit in a room with electronic fluo-
rescent lighting (inverter or rapid start type), the remote
controller's transmission distance may be shortened.
Indoor units should be installed as far away from fluores-
cent lighting as possible.
(2) Use suspension bolts for installation. Check whether
the ceiling is strong enough to support the weight of
the unit or not. If there is a risk, reinforce the ceiling
before installing the unit.
(Installation pitch is marked on the carton box for installa-
tion. Refer to it to check for points requiring reinforcing.)
PREPARATIONS BEFORE INSTALLA-
TION
(1) Confirm the positional relationship between the unit
and suspension bolts. (Refer to Fig. 2)
• Install the inspection opening on the control box side where
maintenance and inspection of the control box and drain
pump are easy. Install the inspection opening also in the
lower part of the unit.
300
or more
Maintenance
space
Ceiling
Floor surface
(length : mm)