Download Print this page

Mounting Bracket - Elnur CMX15BG Installation Instructions And User Manual

Digital modulatingelectric boilers electric combi boilers

Advertisement

4.5 CLEARANCES
A: 50 mm
B: 10 mm
C: 200 mm
The clearances around the boiler as shown above must be observed for correct operation.
A minimum of 200mm clearance must be maintained underneath the boiler to allow replacement of the heating
elements if required. A minimum of 500 mm clearance must be maintained in front of the boiler to enable easy
access for servicing.
Ensure sufficient space to make all water connections including the outlet pipes for the heating and hot water safety
valves which should be routed to a suitable discharge point.

4.6 MOUNTING BRACKET

Mark the holes positions using the wall bracket as a template per the diagram.
Fit bracket securely onto wall before lifting appliance into position.Drill the holes and fit the bracket ensuring it is
level using suitable high strength screws, with appropriate plugs or fixings, minimum M10 size.
6

Advertisement

loading

This manual is also suitable for:

Cm15bg