Setup; Loose Parts; Installing The Shift Lever - Toro Proline 30165 Operator's Manual

Mid–size traction unit proline gear 12.5hp
Hide thumbs Also See for Proline 30165:
Table of Contents

Advertisement

Setup

Note: Determine the left and right sides of the machine
from the normal operating position.

Loose Parts

Note: Use the chart below to verify all parts have been shipped.
DESCRIPTION
Shift lever
Shift lever mounting bracket
Washer, 1/4 in.
Bolt, 1/4 x 2 in.
Fuel tank
Control panel
Bolt, 5/16 x 7/8 in.
Lock washer, 5/16 in.
Washer, 5/16 in.
Hose clamp
Upper handle
Flanged bolt, 3/8 x 1 in.
Flange nut, 3/8 in.
Wire tie
Rod fitting
Clevis pin
Washer, 1/4 in.
Hairpin cotter
Operator's Manual
Engine Operator's Manual
Parts Catalog
Registration card

Installing the Shift Lever

1. Align mounting block with flats of shaft on top of
transmission and slide onto shaft (Fig. 2).
Note: Do not remove rubber washer on transmission shaft.
QTY.
1
1
Installing the shift lever
1
1
1
1
4
Installing the control panel and fuel tank
4
4
2
1
4
Installing the upper handle
4
1
Connecting the wire harness
2
2
Installing the control rods
2
2
1
Read before operating machine
1
1
1
Fill out and return to Toro
2. Align mounting hole in lever with mounting block on
transmission. Secure lever to transmission with 51 mm
(2 in.) bolt and washer. Torque bolt to 13 N m
(115 in.–lb.).
12
USE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents