Install Front Castors; Install Upper Handle; Bolt 3/8-16 X 3/4" (19 Mm); Flange Nut - Toro 30194 Operator's Manual

36" mid-size mower
Hide thumbs Also See for 30194:
Table of Contents

Advertisement

DESCRIPTION
Fuel tank
Bolt 5/16–1/ x 7/8" (22.5 mm)
Lock washer 5/16"
Washer 5/16"
Stud
Spring
Hose clamp
Operator's Manual
Engine Operator's Manual
Parts Catalog
Registration card

Install Front Castors

1.
Align castors with holes on top and front of
mower and insert (8) 3/8–16 x 3/4" (19 mm)
bolts through mower. Secure with (8) 3/8–16
flange nuts below mower (Fig. 1).
Note:
Tighten lower bolts first to pull castor
against front, then top bolts last.
2.
Torque bolts to 30–35 ft. lb. (40–47 N m).
Figure 1
1. Front castor
2. Bolt 3/8–16 x 3/4" (19 mm)
QTY.
m–3777
3. Flange nut 3/8–16
1
2
2
4
Install fuel tank
2
2
1
1
Read before operating machine
1
1
Fill out and return to Toro
1

Install Upper Handle

1.
Position handle outside frame and align
mounting holes. Select desired lower mounting
holes for high, medium or low position
according to operators height (Fig. 2).
2.
Secure each side with (2) 3/8–16 x 1" (26mm)
bolts and (2) 3/8–16 locknuts (Fig. 2).
3.
Torque bolts to 25 ft. lbs. (34 N m).
Figure 2

1. Upper handle

2. Rear frame
3. Bolt 3/8–16 x 1" (26mm)
Assembly
USE
m–3784
4. Locknut 3/8
5. Low
6. High
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proline 13 hpProline 30194

Table of Contents