Electrical Connections - Panasonic NH-P8ER1 Operating & Installation Instructions Manual

Heat pump tumble dryer
Table of Contents

Advertisement

ELECTRICAL CONNECTIONS

The dryer should be left to stand still for at least two hours
before it is connected to the power mains to allow the system to
stabilise.
Plug the dryer's mains plug directly into a mains socket. Do not use
an extension lead due the possible danger of overheating and fire.
The nominal voltage and other information are given on the rating
plate located under the door frame.
To prevent from damage by excess voltage on the mains due
to lightning strike we recommend use of a class I over-voltage
protector between the machine and the mains.
NH-P8ER1_WGB_En.indd
19
2h
After installation, the mains socket should be freely accessible.
The mains socket should be fitted with an earth contact (in
compliance with the relevant regulations).
19
2015/08/24
10:55:55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents