Download Print this page

Yunca Gas MONTE BASE Clean Air Sub 1.0 Installation Instructions page 3

Advertisement

FIG. C: HEATER DIMENSIONS & WATER BOOSTER POSITION –
MONTE BASE WOODBURNER
Note: A water booster shall be fitted only with "Wet" model installations unless otherwise allowed by Regional Council rules.
FIG. D: HEATER POSITION.
Above: Non combustible wall clearances. Brick lining. From the floor to within 25mm of ceiling. Leave air vents
at the bottom to allow airflow in the cavity. If Yunca flue mounted shield is fitted, brickwork may be 1200mm high
as long as all vertical joints in top and bottom of brickwork are left out to allow airflow when brickwork is capped.
FIG D: MINIMUM FIRE TO COMBUSTABLE WALL CLEARANCES - MONTE WOOD-BURNER
(WITH YUNCA FLUE MOUNTED SHIELD FITTED). Measurements in millimetres.
A
B
200
450
FIG D: MINIMUM FLOOR PROTECTION MEASUREMENTS
(WITH YUNCA FLUE MOUNTED SHIELD FITTED). Measurements in millimetres.
C
D
300
125
Install-MONTE_BASE - SEP_2015.doc
(not to scale)
(Not to scale)
E
F
280
366
J
K
913
999
FIG E: FLUE SYSTEM REQUIREMENTS
Note! All Dimensions are in millimetres
G
H
782
600
L
M
1481
1288
(not to scale)
www.yunca.co.nz
N
O
633
663
Page 3 of 4
P
699

Advertisement

loading