Element PLX-4202B Service Manual page 8

Hide thumbs Also See for PLX-4202B:
Table of Contents

Advertisement

Plasma TV Service Manual
• To prevent electric shock and breakage of PC board, start the servicing work at least 30
seconds after the main power has been turned off. Especially when installing and
removing the power supply board and the SUS board in which high voltages are applied,
start servicing at least 2 minutes after the main power has been turned off.
• While the main power is on, do not touch any parts or circuits other than the ones
specified. The high voltage power supply block within the PDP module has a floating
ground. If any connection other than the one specified is made between the measuring
equipment and the high voltage power supply block, it can result in electric shock or
activation of the leakage-detection circuit breaker.
• When installing the PDP module in, and removing it from the packing carton, be sure
to have at least two persons perform the work while being careful to ensure that the
flexible printed-circuit cable of the PDP module does not get caught by the packing
carton.
• When the surface of the panel comes into contact with the cushioning materials, be
sure to confirm that there is no foreign matter on top of the cushioning materials before
the surface of the panel comes into contact with the cushioning materials. Failure to
observe this precaution may result in, the surface of the panel being scratched by foreign
matter.
• When handling the circuit board, be sure to remove static electricity from your body
before handling the circuit board.
• Be sure to handle the circuit board by holding the large parts as the heat sink or
Element Confidential
- 8 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Plx-5002b

Table of Contents