Handling Precautions; Moisture-Proof Packing; Mounting Precautions; Mounting Methods - Toshiba TPS856 Owner's Manual

Ultra-compact surface-mount photo-ic for illuminance sensors
Table of Contents

Advertisement

Handling Precautions

Insert a bypass condenser of up to 0.1μF between V
Please put the bypass capacitor of 0.1uF between OUT and GND near the device if you use it as a current output
(There is no load resistance).
When V
is turned on it takes at least 20 ms for the internal circuit to stabilize. During this time the output
CC
signal is unstable. Please do not use the unstable signal as the output signal.

Moisture-Proof Packing

(1)
To avoid moisture absorption by the resin, the product is packed in an aluminum envelope with silica
gel.
(2)
Since the optical characteristics of the device can be affected during soldering by vaporization
resulting from prior absorption of moisture and they should therefore be stored under the following
conditions:
Temperature: 5°C to 30°C, Relative humidity: 70% (max), Time: 168 h (max)
(3)
Baking in taping with reel is required if the devices have been store unopened for more than six
months or if the aluminum envelope has been opened for more than 168 h.
These devices are packed on tapes; hence, please avoid baking at high temperature.
Recommended baking conditions: 60°C for 12 h or longer, Perform baking only once

Mounting Precautions

TPS856 uses a clear resin, and delicate handling is necessary for it.
The characteristic change or the product might be damaged by the handling method of mounting.
Please note the following and handle the product.
(1)
Do not apply stress to the resin at high temperature.
Time until the product returns at the normal temperature after mounting of
the reflow is different according to the mounting substrate and the environment.
Please do not give the stress with heat remained in the product.
(2)
The resin part is easily scratched, so avoid friction with hard materials.
(3)
When installing the assembly board in equipment, ensure that this product does not come into
contact with other components.
(4)
Please confirm the heat contraction of the substrate of the reflow mounting doesn't influence the
product. The load is given to the product by mounting that the heat contraction is large on the
substrate and the installation position of the substrate. Please note that the characteristic changes
or the product might be damaged.

Mounting Methods

(1)
Example of reflow soldering
(*)The product is evaluated using above reflow soldering conditions. No additional test is performed
exceed the condition (i.e. the condition more than MAX values) as an evaluation.
Please perform reflow soldering under the above conditions. Perform reflow soldering no more than
twice.
Please perform the first reflow soldering within 168 h after opening the package with reference to
the above temperature profile.
4°C/s max (*)
190°C
180°C
Preheating part
4°C/s max (*)
and GND near the device to stabilize the power supply line.
CC
10s max (*)
60 ∼ 120 s
Time (s) →
5
260°C max (*)
230°C
30 s to 50 s Heating part
TPS856
2007-10-01

Advertisement

Table of Contents
loading

Table of Contents