Viessmann VITOMAX 200-HW Installation Instructions Manual
Viessmann VITOMAX 200-HW Installation Instructions Manual

Viessmann VITOMAX 200-HW Installation Instructions Manual

Hide thumbs Also See for VITOMAX 200-HW:

Advertisement

VIESMANN

Installation instructions

for contractors
Vitomax 200-HW
Type M238
Oil/gas fired high pressure hot water boiler
Combustion output 4.0 to 18.2 MW
VITOMAX 200-HW
Dispose after installation.
5592 830 GB
6/2007

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VITOMAX 200-HW and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Viessmann VITOMAX 200-HW

  • Page 1: Installation Instructions

    VIESMANN Installation instructions for contractors Vitomax 200-HW Type M238 Oil/gas fired high pressure hot water boiler Combustion output 4.0 to 18.2 MW VITOMAX 200-HW Dispose after installation. 5592 830 GB 6/2007...
  • Page 2: Safety Instructions

    Safety instructions Please follow these safety instructions closely to prevent accidents and material losses. Safety instructions explained & the Code of Practice of relevant trade associations, Danger & all current safety regulations as This symbol warns against the defined by DIN, EN, DVGW, TRGI, risk of injury.
  • Page 3: Table Of Contents

    Index Product information & Clearance dimensions ................Installation sequence Boiler handling ................... Boiler positioning and adjustment ............... Heating water side connections ..............Fitting the test and control equipment ............& Installing the intermediate flow piece............& Fitting the electrode water level limiter ............. 10 &...
  • Page 4: Product Information

    Product information High pressure hot water boiler to For permissible flow temperatures in TRD, compliant with category IV of excess of 120 °C. the Steam Boiler Order [Germany] or Permiss. operating pressure (subject the Pressure Equipment Directive 97/ to version) 6, 8, 10, 13, 16, 18, 20, 22 23/EC.
  • Page 5: Preparing For Installation

    Preparing for installation (cont.) Boiler size Combustion output to EN 12953-3 when operating with Natural gas 4.00 5.10 6.80 9.05 11.30 13.55 15.75 18.20 Fuel oil 4.00 5.10 6.80 8.90 9.80 11.00 12.80 14.00 mm 3300 3700 4300 4900 5400 5900 6350 6800...
  • Page 6: Boiler Handling

    Boiler handling Note 2. Moving the boiler Observe all relevant accident preven- Fitting steel castors underneath foot rail C. tion regulations. Only use the marked lifting points. 3. Secure the pulling means to pulling eyes B. 1. Lifting the boiler Use lifting eyes A or lifting points C on the boiler base.
  • Page 7: Heating Water Side Connections

    Heating water side connections Note Danger Opening the boiler connections Install all pipe connections free of and openings whilst the boiler load and torque stresses. is under pressure can lead to a high risk of severe injury. 1. Thoroughly flush the system (espe- Only open the connections on cially when connecting the boiler to the water side after the boiler...
  • Page 8 Heating water side connections (cont.) Boiler size Combus- tion output to EN 12953-3 when oper- ating with Natural gas 4.00 5.10 6.80 9.05 11.30 13.55 15.75 18.20 Fuel oil 4.00 5.10 6.80 8.90 9.80 11.00 12.80 14.00 Boiler con- nections Boiler flow and return at rated output...
  • Page 9: Fitting The Test And Control Equipment

    Fitting the test and control equipment Note Fit test and control equipment that is pressure tested to the same level as Carry out the installation in accor- the operating pressure of the boiler dance with the instructions supplied and that is suitable for the intended with the devices.
  • Page 10: Fitting The Electrode Water Level Limiter

    Fitting the test and control equipment (cont.) Fitting the electrode water level limiter 1. Insert the electrode into the 3. Fit the threaded flange with elec- threaded flange. trode into the test connector. 2. Trim the electrode (175 mm). Observe the fitting instructions for the electrodes Note The electrode supplied by the boil-...
  • Page 11: Fitting The Pressure Limiting Equipment

    Fitting the test and control equipment (cont.) Fitting the pressure limiting equipment Install the fitting assembly with the Subject to system design, several pressure limiting equipment at the test pressure limiting facilities may be connector of the intermediate flow required. piece.
  • Page 12: Installing The Combustion Chamber Sight Glass

    Connection on the flue gas side (cont.) Boiler size Flue gas External 910 1010 1110 7 mm connection Flue gas Internal 900 1000 1100 7 mm connection Danger Risk of poisoning through escaping flue gas. Seal the drain connectors if they are not used.
  • Page 13: Burner Installation

    Burner installation 1. Secure burner plate A for the Separate burner documenta- tion. burner installation together with seal ring C to boiler flange B. Note If the burner plate was not pre- drilled at the factory, drill the burner fixing holes into the burner plate and cut out the flame tube hole.
  • Page 14: Fuel

    Fuel Systems with oil burner: Natural gas in accordance with Fuel oil EL to DIN 51603 DVGW Code of Practice G260/I and II Systems with gas burner: or in accordance with local regula- tions. Burner adjustment For burner adjustments, see Adjust the highest oil or gas through- the separate burner documen- put of the burner to the specified com-...
  • Page 15 Burner adjustment (cont.) Flue gas pressure drop and flue gas temperature differential subject to the boiler output A Boiler size 8 C Boiler size 7 B Boiler size 3 D Boiler size 6...
  • Page 16: Commissioning And Adjustment

    Commissioning and adjustment Service instructions for boiler and boiler control unit and separate burner documenta- tion. Viessmann Werke GmbH&Co KG Viessmann Limited D-35107 Allendorf Hortonwood 30, Telford Telephone: +49 6452 70-0 Shropshire, TF1 7YP, GB Fax: +49 6452 70-2780 Telephone: +44 1952 675000 www.viessmann.com...