Installation; Before Installing The Range - LG LRG411 5ST Owner's Manual

Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION
13
INSTALLATION
Before
Installing
the Range
Make sure your range is properly installed and grounded by a qualified installer, according to the installation
instructions. Any adjustment and service should be performed only by qualified gas range installers or service
technicians.
in the Commonwealth
of Massachusetts
• This product must be installed by a licensed plumber or gas fitter.
When using ball type gas shut-off valves, they must be the T-handle type.
When using a flexible gas connector, it must not exceed 3 feet in length.
Preparing
for installation
Tools Needed
Phillips screwdriver
Flat-blade screwdriver
Pencil and ruler
Open-end oradjustable
wrench
Pipe wrench (2)
(one for support)
Level
Materials You May Need
Gas line shut-off valve
Pipe joint sealant that resists action of natural and LP gases
Flexible metal appliance connector (3/4"or 1/2"NPT x V2" I.D.)
Never use an old connector when installing a new range.
Flare union adapter for connection to gas supply line (3/4"or 1/2"NPT x V2" I.D.)
Flare union adapter for connection to pressure regulator on range (1/2" NPT x 1/2"I.D.)
Liquid leak detector or soapy water
Lag bolt or V2" O.D. sleeve anchor (for concrete floors only)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lrg4111swLrg411 3stLrg4111 stLrg4111sb

Table of Contents