Commissioning (For Single Boiler Application); Switching The Appliance On/Off; Setting Date And Time - Bosch SSB255 Installation And Service Manual

Buderus ssb boiler
Hide thumbs Also See for SSB255:
Table of Contents

Advertisement

34 | Commissioning (for single boiler application)

5
Commissioning (for single boiler application)
8
1
2
3
4
Fig. 48
No .
Description
1
ON/OFF power switch
2
Reset button
3
Menu button
4
ESC button
5
PC service connection
6
OK button
7
UP/DOWN/LEFT/RIGHT button
8
Display
5 .1

Switching the appliance ON/OFF

Switch the appliance ON using the ON/OFF switch. The display will
appear as follow:
1
70.0°F
DHW Setpoint
Fig. 49
In the left of the display is shown the external temperature 1. This value
is only displayed on a single boiler system or with the primary boiler in a
cascade system when the outdoor sensor is installed.
In the right of the display is shown the set setpoint value 2.
In the top right side is displayed the time 3.
To switch off the appliance use the ON/OFF switch.
6720818454 (2016/02) US
7
6
5
04:29 pm
2
3
120.0°F
5 .2

Setting date and time

Press the "menu" button and select "Settings" using the UP/DOWN
button.
Menu
Domestic Hot Water
Information
Settings
System Test
Fig. 50
Press the "OK" button and select "General Settings" using the UP/DOWN
button.
Settings
General Settings
Boiler Settings
Fig. 51
Press the "OK" button and select "Date & Time" using the UP/DOWN
button.
General Settings
Language
Unit type
Date & Time
Other settings
Fig. 52
Press the "OK" button. The display will appear as follow:
Date & Time
Date:
Time:
Time Zone Settings
Display Settings
Fig. 53
Press the "OK" button to highlight the values. The values can be changed
using the "UP/"DOWN" keys. When the value entered is correct then
press "OK" to insert the next value.
Sun 10/25/2015
03:02 pm
SSB

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ssb399Ssb512

Table of Contents