C) Electrical; Step 4 - Assembling; Step 5 - Commissioning - Zenith 11652 Autoboil Installation & Operating Instructions Manual

Table of Contents

Advertisement

Page 6 of 12
Installation Procedures
c)
Electrical
For concealed electrical connection, connect a power cable from the
rear of the heater to the terminal block within the heater as shown.
Do not turn the power ON until the heater is filled with water.
Blue
Green
Red

Step 4 - Assembling

Place the heater case back onto the chassis and secure the two top and four
bottom fixing screws.
Screw the tap assembly clockwise onto the tap outlet tube using PTFE tape.
Screw the tap clockwise until the tap assembly touches the fascia without
pressure.
Continue to turn the tap a further one full turn until the tap lever is upright.

Step 5 - Commissioning

Check previous steps. Turn water supply ON, check connections for leaks.
Turn tap handle to the "lock down" side and leave open until water starts
flowing from the outlet. Return the handle to the closed position to stop water
flow and turn the handle 180º to the "cup fill" position.
Inlet water temperature
15 Litre models
25 Litre models
40 Litre models
Autoboil - Installation & Operating Instructions - 81355 - May 2012 v1.01
continued
continued
continued
15°C
10°C
40 minutes
43 minutes
47 minutes
50 minutes
60 minutes
64 minutes

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

12652 autoboil04652 autoboil

Table of Contents