Fixing Installation Plate; Drill A Hole In The Wall; Flaring Work - Friedrich M24YJ Installation Manual

Ductless split systems
Hide thumbs Also See for M24YJ:
Table of Contents

Advertisement

Available languages

Available languages

10

Fixing Installation Plate

The wall you select should be strong and solid
enough to prevent vibration
1
Mount the installation plate on the wall with
type "A" screws.
- Mount the installation plate horizontally by
aligning the centerline using Horizontal
meter .
Installation Plate
Chassis
Hook
Type "A" Screws
2
Measure the wall and mark the centerline.
It is also important to use caution
concerning the location of the installation
plate. Routing of the wiring to power outlets
is through the walls typically. Drilling the
hole through the wall for piping
connections must be done safely.
43
Ø65
120
Installation plate
Left rear piping

Drill a Hole in the Wall

- Drill the piping hole with a ø65mm hole core
drill. Drill the piping hole at either the right or
the left with the hole slightly slanted to the
outdoor side.
!
Use the sleeve to prevent damage for
tube assembly.

Flaring Work

Main cause for gas leakage is due to defect of
flaring work. Carry out correct flaring work in
the following procedure.
Cut the pipes and the cable
1
Use the piping kit accessory or the pipes
purchased locally.
2
Measure the distance between the indoor
Ø65
43
and the outdoor unit.
110
3
Cut the pipes a little longer than measured
Right rear piping
distance.
4
Cut the cable 1.5m (4.9 ft) longer than the
pipe length.
Copper
pipe
WALL
Indoor
Bushing
Sleeve
CAUTION
90°
Slanted Uneven Rough
Outdoor

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M30yjM36yj

Table of Contents