QQ
3 7 63 1515 0
• This set can be disassembled in the order shown below.
2-1.
DISASSEMBLY FLOW
SET
2-2. UPPER CASE
(Page 2-1)
2-3. FRONT PANEL ASSY
(Page 2-2)
2-4. BD DRIVE
(Page 2-2)
Note: Follow the disassembly procedure in the numerical order given.
2-2.
UPPER CASE
TE
L 13942296513
1 tapping screw
(tightening torque = 5.5 to 7.5 kgf•cm)
www
.
http://www.xiaoyu163.com
SECTION 2
DISASSEMBLY
2-5. REAR PANEL BLOCK
(Page 2-3)
2-6.
MB-127 BOARD
(Page 2-3)
3 upper case
x
ao
u163
y
i
http://www.xiaoyu163.com
2 9
8
2-7. SWITCHING REGULATOR
(Page 2-4)
Q Q
3
6 7
1 3
1 5
2 three screws
(tightening torque = 5.5 to 7.5 kgf•cm)
co
.
2-1
BDP-BX2/S360
9 4
2 8
0 5
8
2 9
9 4
2 8
1 tapping screw
(tightening torque = 5.5 to 7.5 kgf•cm)
m
9 9
9 9