LG L3-C363LA0 Service Manual page 53

Table of Contents

Advertisement

(6) Air Purging of the Pipings and indoor unit
The air which contains moisture remaining in the is refrigeration cycle may cause a malfunction on the
compressor.
1. Confirm that both the liquid side valve and the gas side valve are set to the closed position.
2. After connecting the piping, check the joints for gas leakage with gas leak detector.
3. Remove the service port nut, and connect the gauge manifold and the vacuum pump to the service port
by the charge hose.
4. Vacuum the indoor unit and the connecting pipes until the pressure in them lowers to below-76cmHg.
5. Disconnect the charge hose and fit the nut to the service port.
(Tightening torque: 1.8kg . m)
6. Remove the valve stem nuts, and fully open the stems of the 2-way and 3-way valves with a hexagon
wrench.
7. Tighten the valve stem nuts of the 2-way valve and 3-way valve.
Indoor unit
Indoor unit
Vacuum pump
Liquid side
Gas side
Liquid side
Gas side
manifold gauge
Low-
handle
Hi- handle
(OPEN)
(OPEN)
Outdoor unit
Closed
2-Way
valve
Closed
3-Way
valve
Closed
2-Way
valve
Closed
3-Way
valve
Installation
Service Manual 53

Advertisement

Table of Contents
loading

This manual is also suitable for:

L3-c363ma0L3-h363na0L3-c363na0L3-h363ma0L3-h363la0

Table of Contents