Advertisement

Max Weishaupt GmbH
88475 Schwendi, Germany
Tel. +49 (73 53) 83-0
Fax +49 (73 53) 83-358
www.weishaupt.de
Print-No. 83053102, December 2006
Printed in Germany. All rigths reserved.

Operating instructions

Weishaupt Thermo Condens
WTC 15-A
WTC 25-A
WTC 32-A
Address of installer
1/2006 GB

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the WTC 15-A and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Weishaupt WTC 15-A

  • Page 1: Operating Instructions

    Operating instructions Weishaupt Thermo Condens WTC 15-A WTC 25-A WTC 32-A Address of installer Max Weishaupt GmbH 88475 Schwendi, Germany Tel. +49 (73 53) 83-0 Fax +49 (73 53) 83-358 www.weishaupt.de Print-No. 83053102, December 2006 Printed in Germany. All rigths reserved.
  • Page 2: For Your Safety

    For your safety Chimney sweep function Gas inhalation can lead to suffocation or poisoning, • Activate the symbol list by turning the dial knob and depending on the type and quantity of gas inhaled. set cursor to chimney sweep symbol. There is a risk of explosion if an ignition source is •...
  • Page 3: Table Of Contents

    For room air dependent operation only! The complete heating system should be serviced at least once a year by a representative of the heating company/installer or other qualified engineer. We recommend a Weishaupt service contract be taken out. Inlet air must be open! Contents Commissioning...
  • Page 4: Commissioning

    Commissioning Top up heating water: 1. Open gas shut off valve If measures for water treatment were taken when the heating system was initially filled with water, 2. Switch on boiler these measures will have to be repeated when topping up. Speak to your heating engineer. ATTENTION 3.
  • Page 5: Boiler Shut Down

    Half-yearly inspection: Boiler shutdown Your boiler is switched on and off automatically by the Is system pressure correct? boiler controls depending on heat demand. The heating system must be switched off at the unit master switch for the following: • for boiler cleaning by qualified engineer •...
  • Page 6: What To Do Should Problems Occur

    What to do should problems occur To avoid damage to the system, do not reset the boiler more than twice. If the boiler locks out for a third time: 1. Note down message displayed ATTENTION 2. Request a service Possible fault displays: Display Description Action required...
  • Page 7: Operating The Controller

    Operating the controller Standard display All operating elements are available once the front flap has been opened. Dial knob This knob is used to change or adjust settings. Right turn: • settings are increased • reference marks are moved to the right or down Left turn: •...
  • Page 8: Chimney Sweep Function

    Operation levels Settings Setting of setpoints and display of additional system values. Two operation levels are available. Level 1 can be directly accessed by the end-user. If a Setting procedure: Remote Control Station is fitted, only the chimney sweep • Turn the knob to display the symbol list.

This manual is also suitable for:

Wtc 25-aWtc 32-a

Table of Contents