HKS lazar Smart Fire SF 21 Operation Manual

HKS lazar Smart Fire SF 21 Operation Manual

Pellets burning automatic boiler

Advertisement

Operation manual
pellets burning automatic boiler
Smart Fire
This manual shall be kept by the user.
Obey thoroughly instruction found here to facilitate long and safe operation of the boiler and preserve the warranty.
All rights reserved.
Last update 07/05/2010
Instrukcja Smart Fire
wer. 07/05/2010/ENG
HKS LAZAR
str.1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Smart Fire SF 21 and is the answer not in the manual?

Questions and answers

Summary of Contents for HKS lazar Smart Fire SF 21

  • Page 1 This manual shall be kept by the user. Obey thoroughly instruction found here to facilitate long and safe operation of the boiler and preserve the warranty. All rights reserved. Last update 07/05/2010 Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.1...
  • Page 2 Please read the Manual and the attached manual of the control panel, as this is necessary for safe operation of the boiler. Do not hesitate to contact us should you had any enquires. Best Regards Marcin Lazar Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.2...
  • Page 3: Table Of Contents

    9.3. Repairs of the break downs..................... 23 9.4. Annual inspection........................24 10. Scraping of the system after its lifetime..................24 11. Terms of warranty and liability ....................25 12. Declarations and licensing ......................27 Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.3...
  • Page 4: General Information

    3. Safety rules Read these rules before launching operation. Failure in submission to the instruction may lead to: casualty, loss of health, life hazard, damage to the system, the heating installation and the Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.4...
  • Page 5 If the temperature of tap water has been set up above 60ºC, warrant admixture of cold water as this creates risk of burning injury. Facilitate proper air removal off the boiler and the heating system. Use only manufacturer's spare parts. Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.5...
  • Page 6: Boiler's Data

    CO emission at the minimal output (10% O mg/m CO emission at the nominal output (13% O mg/m CO emission at the minimal output (13% O mg/m Noise below 65 Electricity plug-in 1 PEN ~50Hz 230V TN-S Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.6...
  • Page 7: Boiler Construction

    Fuel falls from the main fuel container to the auger feeder. This in turn, pushes fuel to the burner in the combustion chamber. The Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.7...
  • Page 8 The external covers and the body are insulated with mineral wool to reduce heat loss in operation. The covers are made of steel sheets covered with high quality powder paint. Fig. 1. Dimensions of the Smart Fire boiler Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.8...
  • Page 9 1 - display; 2 - thermostat reset (under the plastic cap); 2- inspection hole of the controller; 4 - fuel container clap door 5 -knob of the heat exchange cleaner; 6 - heat exchange covering panel; 7- boiler door cover; Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.9...
  • Page 10 Fig. 3. Schema of the Smart Fire boiler 8-heating water outlet; 9 - returning water inlet; 10 - Exhaust temperature sensor; 10 - Exhaust exit collar; 2- inspection hole of the controller; 13-outlet fan; Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.10...
  • Page 11 Front view (open panel) Fig. 4. Schema of the Smart Fire boiler 14-limiting cut off switch; 9 - returning water inlet; 15 - combustion chamber door. 16 -burner cleaning hatch; 17-ash try chamber door; Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.11...
  • Page 12: Type Of Fuel

    DAMP FUEL REDUCED THE BOILER'S OUTPUT CONSIDERABLE (EVEN BY 50%) AND REDUCES LIFE SPAN OF THE PARTS THAT ARE AFFECTED BY DAMP FUEL MANY TIMES OVER. USE OF INADEQUATE QUALITY FUEL OR DAMP FUEL WILL VOID WARRANTY ON THESE PARTS. Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.12...
  • Page 13: User's Operations Manual

    In particular, check moisture, hardness and dust content soaking a sample in water. Factory temperature setup offers proper operation of the system. However, • Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.13...
  • Page 14: Maintenance And Cleaning

    Access the combustion chamber unscrewing two handles holding the inspection door. Sweep the ash to the ash tray. Clean the heat exchange regularly using the manual cleaning system. Its enough to make a few Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.14...
  • Page 15: Extinguishing Of The Boiler

    Remove ash and provide for ventilation of the system if you stop it for longer than one week. Failure to do so may lead to corrosion. Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.15...
  • Page 16: Service Operations Manual

    500 mm at the boiler's side; • min. 500 mm - back; • min. 800 mm above. A sketch of Smart Fire placement in the boiler's room showing the necessary clearances is shown at the fig. 5. Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.16...
  • Page 17: Boiler's Installation

    45ºC. The installation must comply with the regulations in force, the industry standards and the construction principles. Follow the installation sketches on the fig.6 below. Other, viable from the Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.17...
  • Page 18 It must facilitate proper and safe operation of the heating systems. The installation must be inspected by appropriate authorities if local or national regulations require this. Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.18...
  • Page 19: Service Operations Manual

    - check for smoke leaking from the doors edges, adjust hinges if necessary. • Fuel container - check for smoke leaking from the container. Seal off if necessary Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.19...
  • Page 20: Repairs Of The Break Downs

    Worn out pieces and minor defects shall be replaced and repaired. The service shall make a proper entry in the warranty card noting its remarks and recording the repairs done. The inspection shall be recorded on the service coupon and mailed to the HKS LAZAR for registration purposes. Instrukcja Smart Fire wer.
  • Page 21: Scraping Of The System After Its Lifetime

    2) The launch inspections, repairs and all tasks beyond the user's operation can only be performed by service authorised by the HKS LAZAR. 3) The repairs shall not include the tasks of the operator: ignition of the boiler, cleaning, setup of the controller within the scope assumed in the controller's manual.
  • Page 22 3) Within the warranty period the user shall be entitled to: unpaid repairs (except of the user tasks described in the Operations Manuals • replacement of the system with a new one once the Authorised Service of HKS LAZAR • confirms impossibility of repairs 1) The pieces worn out within the regular operation are not covered by the warranty.
  • Page 23 • sending the coupon will render the warranty claim void. Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.23...
  • Page 24: Declarations And Licensing

    Heating boilers for solid fuels, hand and automatically fired, nominal heat output of up to 300 kW. Terminology, requirements, testing and marking Confirmed by the sign of: placed on the system. Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.24...
  • Page 25 The setup of the system following the tables in the Operations Manuals shall be completed by an authorised service partner of HKS LAZAR. The completeness including the accessories has been warranted by HKS LAZAR Unfilled Warranty Card is void. Measurement...
  • Page 26 The serviceman called by the user shall check if the system is operated as provided by the Operation Manuals All remarks shall be recorded below Date entry Task Signature and stamp pf Customer's signature the service partner Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.26...
  • Page 27 Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.27...
  • Page 28 The setup of the system following the tables in the Operations Manuals shall be completed by an authorised service partner of HKS LAZAR. The completeness including the accessories has been warranted by HKS LAZAR Unfilled Warranty Card is void. Measurement...
  • Page 29 Ustawa z dnia 29/08/1997 o Ochronie Danych Osobowych Dz.U.Nr133poz 883. [Personal data act] For the HKS LAZAR (please tear off and sent to the HKS LAZAR) HKS LAZAR ul. Wodzisławska 15 B 44-335 Jastrzębie Zdrój tel.
  • Page 30 Ustawa z dnia 29/08/1997 o Ochronie Danych Osobowych Dz.U.Nr133poz 883. [Personal data act] Instrukcja Smart Fire wer. 07/05/2010/ENG HKS LAZAR str.30...

Table of Contents