7. Level 2 Repair
5
1) Assemble the PBA to LCD Bracket.
2) Assemble LCD connector on PBA
※ Caution
1) Be care of damage to FPCB
7
1)Screw 6 point.
※ Caution
1) Be care of scratch and molding damage.
2) Torque : 1.0 ~ 1.2 Kgf·cm
This Document can not be used without Samsung's authorization
SAMSUNG Proprietary-Contents may change without notice
6
1)Assemble the Rear.
2)Assemble the Intenna Cover.
※ Caution
1) Be care of scratch and molding damage.
8
1)Assemble Deco Top.
7-6