Servicing - Potterton Promax Ultra Combi 24 Installation And Service Manual

Condensing combination boiler
Hide thumbs Also See for Promax Ultra Combi 24:
Table of Contents

Advertisement

Flue Sampling
Point
Air Sampling
Point
Case Front Panel
Securing Screws
Bracket
34
© Baxi Heating UK Ltd 2016
Case Front Panel
Fig. 43
Condensate Trap
Gasket
Condensate Drain
Pipe Connection
1. For reasons of safety and economy, it is recommended that
the boiler is serviced annually. Servicing must be performed by
a competent person in accordance with B.S. 7967-4.
2. After servicing, complete the relevant Service Interval Record
section of the Benchmark Commissioning Checklist at the rear
of this publication.
3. Competence to carry out Checking Combustion
Performance
B.S. 6798 'Specification for Installation & Maintenance of Gas
Fired Boilers not exceeding 70kW' advises that:-
• The person carrying out a combustion measurement should
• The flue gas analyser used should be one meeting the
• Competence can be demonstrated by satisfactory
1. Ensure that both the gas and electrical supplies to the
boiler are isolated and that the boiler is cool.
2. Remove the screws securing the case front panel. Lift the
panel slightly to disengage it from the studs on top of the case
(Fig. 43) and hinge down the Control Box.
3. Disconnect the two pipes from the top of the condensate
Fig. 44
trap and the drain pipe from the condensate drain pipe
connection. Undo the screw securing the bracket and trap to
the boiler lower panel (Fig. 44).
4. Remove the trap. Take care not to spill any residual
condensate on the controls and P.C.B. Thoroughly rinse the
trap and examine the gasket on the trap base, replacing if
necessary.

12.0 Servicing

12 .1
Performance Safety Check & Annual Servicing
IMPORTANT: During routine servicing, and after any
maintenance or change of part of the combustion circuit, the
following must be checked:-
• The integrity of the complete flue system and the flue seals
(check air inlet sample).
• The integrity of the boiler combustion circuit and relevant
seals as described in Section 12.2.
• The operational gas inlet pressure as described in Section
10.2.1 to 10.2.7 and the gas rate as described in 10.2.8.
• The combustion performance as described in 'Check the
Combustion Performance' (12.1.4 to 12.1.6 below).
have been assessed as competent in the use of a flue gas
analyser and the interpretation of the results.
requirements of BS7927 or BS-EN50379-3 and be calibrated
in accordance with the analyser manufacturers' requirements.
completion of the CPA1 ACS assessment, which covers the
use of electronic portable combustion gas analysers in
accordance with BS 7967, Parts 1 to 4.
Check the Combustion Performance (CO/CO
4. Set the boiler to operate at maximum rate as described in
Section 14.1.1 to 14.1.6.
5. Remove the plug from the flue sampling point, insert the
analyser probe and obtain the CO/CO
less than 0.004.
6. If the combustion reading (CO/CO
this, and the integrity of the complete flue system and
combustion circuit seals has been verified, and the inlet gas
pressure and gas rate are satisfactory either:
• Perform the 'Annual Servicing - Inspection' (Section 12.2) &
re-check.
• Perform the Combustion & Calibration functions (Section
14.0) & re-check.
• Replace the gas valve (Section 13.23) & re-check.
12.2
Annual Servicing - Inspection
ratio)
2
ratio. This must be
2
ratio) is greater than
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents