Operational Checks - Koolaire KD0172A Lnstallation, Operation And Maintenance Manual

Undercounter models
Hide thumbs Also See for KD0172A:
Table of Contents

Advertisement

Available languages

Available languages

Section 3

Operational Checks

GENERAL
Your Koolaire ice machine was factory-operated and
adjusted before shipment. Normally, a newly installed ice
machine does not require any adjustment.
To ensure proper operation, always follow these
Operational Checks when starting the ice machine:
for the first time
after a prolonged out of service period
after cleaning and sanitizing
Routine adjustments and maintenance procedures
outlined in this manual are not covered by the warranty.
SIPHON SYSTEM
To reduce mineral build-up and cleaning frequency, the
water in the sump trough must be purged during each
harvest cycle.
When the water pump de-energizes the level in the
water trough rises above the standpipe starting a siphon
action. The siphon action stops when the water level in
the sump trough drops. When the siphon action stops,
the float valve refills the water trough to the correct level.
Siphon System Check
Follow steps 1 through 6 under water level check.
WATER
LEVEL
Part Number 040004686 8/15
SIPHON
CAP
STANDPIPE
DRAIN
WATER FLOAT VALVE CHECK
Before water will flow into the water trough the float
valve shut-off must be in the OPEN position.
PRESS TO
CLOSE
Water Level
Operation
PRESS TO
OPEN
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kr0270aKd0272aKy0174aKy0274a

Table of Contents