Malfunctions / Troubleshooting; Decommissioning / Disposal - Dimplex SIH 20TE Installation And Operating Instructions Manual

Brine-to-water heat pump for indoor installation
Table of Contents

Advertisement

Available languages

Available languages

SIH 20TE
10 Malfunctions /
Troubleshooting
This heat pump is a quality product and is designed for trouble-
free operation. In the event that a malfunction occurs neverthe-
less, it will be indicated on the display of the heat pump control-
ler. Simply consult the Malfunctions and Troubleshooting table
contained in the in-stallation and operating manual of the heat
pump controller (manager).
If you cannot correct the malfunction yourself, please contact the
after-sales service agent in charge.
ATTENTION!
All work on the heat pump may only be performed by an authorised an
qualified after-sales service.
ATTENTION!
Disconnect all electrical circuits from the power supply before opening
the enclosure.
11 Decommissioning /
Disposal
Before removing the heat pump, disconnect the unit from the
power source and close all valves.The heat pump must be in-
stalled by trained personnel. Environment-relevant requirements
regarding the recovery, recycling and disposal of service fuels
and components in accordance with all relevant standards must
be adhered to. Particular attention must hereby be paid to the
proper disposal of refrigerants and refrigeration oils.
EN-10
452234.66.11 · FD 9411
www.dimplex.de

Advertisement

Table of Contents
loading

Table of Contents