Dunkirk DKVLT-050 Installation, Operation & Maintenance Manual page 82

Wall mounted gas boiler
Table of Contents

Advertisement

User Interface Display
Allowed Range: 1 to 60 Minutes
Default Setting: 30 Minutes
APPENDIX A - CONTROL MODULE
Maximum time boiler operates in DHW mode limited by DHW
Maximum Priority Time Setting.
Priority timer starts when both CH and DHW demand is
present. Boiler will switch from DHW back to CH operation after
Maximum Priority Time has elapsed.
CH demand then has priority until Maximum Priority Time has
elapsed.
Process repeats until either CH or DHW demand satisfied.
System test can be activated via installer menu for testing
system at fixed power rates.
Boiler can be started without CH or DHW demand being
present. System Test has priority over any system demand
while test mode activated.
System test mode automatically ends after 30 minutes boiler
resumes normal operation.
The following modes are available:
Note:
• Before running system test modes, check if hydronic
• Both heat exchanger and CH pumps are activated during
• During System Test Mode, boiler will run at fixed power
• All other safety functions remain active while in System
82
Explanation
• Disabled
• Low power - Burner starts. After ignition period has
finished the burner stays at low power
• Ignition power - Burner starts. Stays at ignition power
• High power - Burner starts. After ignition period has
finished burner stays at high power.
system capable of dissipating heat.
system test only.
rates until supply water temperature is 93°C/195°F
Test Mode.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dkvlt-100Dkvlt-075Dkvlt-299Dkvlt-150Dkvlt-200

Table of Contents