Server Installation - Aberdeen AberNAS 120 Manual

Table of Contents

Advertisement

Aberdeen LLC
For more detailed setup instructions, please refer to the user manual on the documentation CD.
6.1.
The first step is to attach the rear inner slide rails to the server as shown below. The server
is shipped with the front rails preinstalled.
• First, locate the right rear inner rail (the rail that
will be used on the right side of the chassis when
you face the front of the server).
• Align the two square holes on the rail against the
hooks on the right side of the chassis.
• Securely attach the rail to the chassis with the
supplied M4 flat head screws.
• Repeat these steps to install the left rear inner rail to the left side of the chassis.
6.2.
Next, determine where you would like to place the server in the rack then perform the
following steps:
• Position the chassis rail guides at the desired
location in the rack, keeping the sliding rail
guide facing the inside of the rack.
• Screw the assembly securely to the rack using
the supplied brackets.
• Attach the other assembly to the other side of
the rack, making sure that both are at the exact
same height and with the rail guides facing
inward
• Next, line up the rear of the chassis rails with
the front of the rack rails. Slide the chassis
rails into the rack rails until they "click" into
place and slide all the way back. At this point
it may be necessary to depress the locking tabs
while pushing to slide the server completely
into the rack.
• Conclude by tightening the thumbscrews that
hold the front of the server to the rack.

6. Server Installation

NOTE
AberNAS 120 / 126
- 9 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Abernas 126

Table of Contents