oventrop REGUCOR WH Installation And Operating Instructions Manual page 27

Energy storage centre
Table of Contents

Advertisement

Available languages

Available languages

– Connect fresh water station to ball valves via the
corrugated metal pipes G1 with a length of
L = 110 mm.
Illustr. 14 Installation of corrugated metal pipes
Illustr. 15 Installation of corrugated metal pipes
– Separate the blind cover with fixing plate from the
solar group preparation (illustr. 16).
Illustr. 16 Separation of blind cover with fixing plate
– Suspend rear metal sheet into the bracket (illustr.
17 point 1) and fix by using a washer and a locking
nut (point 2).
Illustr. 17 Installation solar group preparation
27

Advertisement

Table of Contents
loading

Table of Contents