Getting Started - Krell Industries Foundation Processor Owner's Reference Manual

Table of Contents

Advertisement

Getting Started

Unpacking and Placement
The Foundation Processor is a precision instrument and should be handled with the utmost care when deciding
where it is to be placed and while it is being unpacked and finally installed. Makes sure installation location is dry
and level, and able to provide adequate ventilation. The Foundation Processor runs warm to the touch and requires
the bottom and top of the unit be free from obstruction with good circulation of air. Allow a minimum of 3 inches
above the unit for proper ventilation. Additional ventilation may be required when the unit occupies the same space
with other electronics that generate heat like power amplifiers. Please consult an authorized KRELL dealer or KRELL
industries to insure proper installation guidelines.
1. Accessories included
A. 1 AC Power cord
B. 1 Handheld Remote control
C. 1 Trigger cable
D. 1 CD w/ Owner's reference
E. 1 Warranty registration card
F. 2 AAA Batteries
G. 1 T-10 torx wrench
AC Power Guidelines
The Foundation Processor is designed to work all over the world. The operating voltage is determined at the factory
and is specifically set to operate in the country of final destination. The Foundation Processor requires good clean
power and doesn't require additional filtration.
NOTE: The Foundation Processor may not operate correctly when AC regeneration or voltage conversion devices are
utilized.
Foundation Processor
5

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Krell Industries Foundation Processor

Table of Contents