Hochiki HE-PSU(4.0) Installation, Commissioning & Operating Manual

Power supply & battery charger

Advertisement

Quick Links

Hochiki Europe (UK) Ltd – HE-PSU(4.0) Installation Manual
HE-PSU(4.0)
Power Supply &

Battery Charger

Installation,
Commissioning
& Operating Manual
Page 1 of 10
2-3-0-997/ISS1/OCT07

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HE-PSU(4.0) and is the answer not in the manual?

Questions and answers

Summary of Contents for Hochiki HE-PSU(4.0)

  • Page 1: Battery Charger

    Hochiki Europe (UK) Ltd – HE-PSU(4.0) Installation Manual HE-PSU(4.0) Power Supply & Battery Charger Installation, Commissioning & Operating Manual Page 1 of 10 2-3-0-997/ISS1/OCT07...
  • Page 2: Table Of Contents

    Hochiki Europe (UK) Ltd – HE-PSU(4.0) Installation Manual CONTENTS 1. GENERAL........................2 2. POWER REQUIREMENTS .....................2 2.1 HE-PSU(4.0) Input/Output Electrical Ratings .............2 2.2 Fuse Ratings ......................3 2.3 Batteries ........................3 3. INSTALLATION .......................3 3.1 Environmental Considerations..................3 3.2 Mounting ........................3 3.3 Connecting to the Input ....................4 3.4 Connecting to the Outputs..................4...
  • Page 3: Fuse Ratings

    Hochiki Europe (UK) Ltd – HE-PSU(4.0) Installation Manual 2.2 Fuse Ratings Input fuse - T2A L250V. Replace only with a fuse of the same type. Load fuse - self-resetting polyfuse 4 Amp rated. (Not replaceable). RPSM fuse- Glass antisurge fuse 4A; BS4265 2.3 Batteries...
  • Page 4: Connecting To The Input

    Hochiki Europe (UK) Ltd – HE-PSU(4.0) Installation Manual 3.3 Connecting to the Input Do not connect a mains supply unless the supply voltage matches that shown on the rating plate. Pass the incoming live and neutral of the mains cable through the ferrite core at the top of the enclosure looping it back so that there are two turns through it.
  • Page 5: Battery Connections

    Hochiki Europe (UK) Ltd – HE-PSU(4.0) Installation Manual 3.4.3 Battery Connections Batteries of even very small capacity are capable of delivering very high currents which can cause fire or injury. Battery connections must therefore be done using extreme caution. As supplied, the HE-PSU(4.0) has battery leads already wired to the battery terminals on the circuit board.
  • Page 6: Commissioning

    Hochiki Europe (UK) Ltd – HE-PSU(4.0) Installation Manual As this is a 24-Volt system, there will be two 12 volt batteries which need to be connected in series. This is done using the jumper link provided. To optimise the service life of the batteries, the battery charger output voltage varies with temperature. To enable optimum temperature compensation, the flying lead thermistor should be attached to one of the batteries.
  • Page 7 Hochiki Europe (UK) Ltd – HE-PSU(4.0) Installation Manual To do this the batteries should be disconnected and the output voltage measured with a calibrated digital voltmeter. The voltage should be within 0.2 volts of the indicated voltage on the voltage/temperature graph below.
  • Page 8: Mounting

    Hochiki Europe (UK) Ltd – HE-PSU(4.0) Installation Manual 6. MOUNTING The power supply should be mounted on a dry, flat surface. Screws or bolts of a minimum of 5mm diameter must be used to mount the enclosure in all four mounting positions.
  • Page 9: Cable Termination

    Hochiki Europe (UK) Ltd – HE-PSU(4.0) Installation Manual 8. CABLE TERMINATION All cable entries to the enclosure must be via Pirelli AXT20SK Cable terminating kits or equivalent. Page 9 of 10 2-3-0-997/ISS1/OCT07...
  • Page 10: Operating Instructions

    Web: www.hochikieurope.com Hochiki Europe (UK) Ltd. reserves the right to alter the specification of its products from time to time without notice. Although every effort has been made to ensure the accuracy of the information contained within this document it is not warranted or represented by Hochiki Europe (UK) Ltd.