Final view
self-levelling
4.7 Connecting the System
The system must be connected by a master electrician.
Cold lead
- 240V/208V connection:
Line 1–Black
Line 2–Red
Bare wire–ground
4.8 Measuring Resistance and Measures' table
• The master electrician who installed and connected the EFMA system must
complete the measures' table (this label is available at the opening of the product)
and give it to the customer. This sheet must be kept near the electrical service.
If this table is not duly completed, the warranty may be annulled. Warranty terms are
set out in Section 8.
22
cement
cement glue
IMPORTANT!
Measure the cable's electrical resistance and record the readings on line 5)
Upon installing the thermostat of the measures' table.
IMPORTANT!
floor covering
- 120V connection:
Line–Black
Neutral–White
Bare wire–ground