GE AVS08 Use And Care & Installation Manual page 11

Table of Contents

Advertisement

8. Close window until it touches
behind air conditioner top bar.
Slide filler panels outward until
they touch window sash tracks. (Do
not release grip on air conditioner
until lower window sash is in final
position.)
9.
Secure filler panels by driving
window sash through mounting
holes in top slides.
10. Secure bottom of filler panels
by driving ~pe A wood screws
into window stool through filler
panel tabs.
of window and install it between
upper and lower window sash.
knobs.
(see page 5).
Instillation in Window Openings 24" to 27X" Wide
1. Remove both filler panels from
air conditioner cabinet.
2. Open window. Locate and mark
two lines 8" to left and 8" to right of
centerline.
3. Screw leveling bolt in appropriate
3/8" threaded hole of support
channel. Depth of window sill will
determine which 3/8" threaded
hole to use.
4. Place support channel over 8"
line of window sill with end against
window stool. Mark window sill
through Locating Hole A of
support channel.
5. Move support channel away from
window stool until Mounting Hole
B is over mark on window sill.
Secure the support channel by
driving a ~pe B wood screw into
the window sill through Mounting
Hole B.
6. Adjust leveling bolt so curved
top of support channel is 1/4"
below top of window stool.
7. Repeat steps 3 through 6 for
second support channel.
8. Center air conditioner in
window opening with bottom bar
sitting
behind window stool.
11
Upper Window Sash
Lower Window Sash
Top Slide
Type A Wood Screw
9. Close window until it touches
behind air conditioner top bar.
10. Fasten lower window sash to
window frame (use finishing nails,
wood screws or "L" brackets).
air conditioner, cut plastic foam
seal to size and fill both sides.
of window and install it between
upper and lower window sash.
knobs.
14. Attach air filter and front grille
(see page 5).

Advertisement

Table of Contents
loading

Table of Contents