Parts Bag Contents; Other Parts; Before You Begin - Kohler K-3900 Installation Manual

Hide thumbs Also See for K-3900:
Table of Contents

Advertisement

Available languages

Available languages

(4) 5/16" x 2-1/2" Lag Bolts
(4) 5/16" Lag Bolt Anchors
Docking
Remote Control
Station

Before You Begin

WARNING: Risk of electric shock. Disconnect power before servicing.
WARNING: Risk of electric shock. For plug-in installations/wall-mounted electrical supply:
Connect only to a properly-grounded, grounding-type receptacle which is protected by a 120 V, 15
A minimum, 60 Hz Ground-Fault Circuit-Interrupter (GFCI) or Residual Current Device (RCD). Do
not remove the grounding pin or use a grounding adapter.
CAUTION: Risk of personal injury. This toilet weighs approximately 100 lbs (45 kg). Lift the toilet
with two people, employing proper lifting technique.
CAUTION: Risk of hazardous gases. If a new toilet is not installed immediately, temporarily place
a rag in the floor flange opening.
CAUTION: Risk of property damage. This toilet is not intended to be installed in buildings where
temperatures will drop below 32°F (0°C). The design of the toilet makes it difficult to remove all
water from the tank. If frozen, the water could damage the tank resulting in leaking.
NOTICE: Follow all local plumbing and electrical codes.
IMPORTANT! This product requires a minimum static pressure of 30 psi (206.8 kPa) for satisfactory rim
wash performance.
Carefully inspect the new toilet for damage.
Consult the online users guide at kohler.com for more information.
Kohler Co. reserves the right to make revisions in the design of products without notice, as specified
in the Price Book.
Confirm all parts below are included before beginning the installation.
Kohler Co.

Parts Bag Contents

2 Mounting Blocks

Other Parts

Back Cover
(Through-the-Floor
Installations)
3
2 Caps
2 #10 x 1-1/2"
Screws
Supply Hose
2 Bushings
Clip
1132336-2-D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents