Download Print this page
Greenway Home Products GRO1025-5-3F Installation Instructions & Owner's Manual

Greenway Home Products GRO1025-5-3F Installation Instructions & Owner's Manual

3 stage 50 gpd reverse osmosis drinking water system

Advertisement

Available languages

Available languages

Quick Links

3 Stage 50 GPD
Water Technologies
Reverse Osmosis Drinking Water System
Water Technologies
Water Technologies
Installation Instructions & Owner's Manual
Model: GRO1025-5-3F

Advertisement

loading
Need help?

Need help?

Do you have a question about the GRO1025-5-3F and is the answer not in the manual?

Questions and answers

Summary of Contents for Greenway Home Products GRO1025-5-3F

  • Page 1 3 Stage 50 GPD Water Technologies Reverse Osmosis Drinking Water System Water Technologies Water Technologies Installation Instructions & Owner’s Manual Model: GRO1025-5-3F...
  • Page 2 able of onTenTs Introduction Page Installation Page 4 - 5 System and Faucet Diagrams Page Source and Drainwater Saddle Valve Page Activation, Troubleshooting and Maintenance Page Warranty Information Page Your Water Test Hardness Iron number *Nitrates Manganese Sulphur yes/no Total Dissolved Solids...
  • Page 3: Conditions For Operation

    nTroduCTIon Read this entire service guide before beginning installation. This Reverse Osmosis Drinking Water System has been designed for quick and simple installation and maintenance. By carefully reading this instruction manual and following the operational guidelines you will insure a successful installation and reliable operation. Routine maintenance is essential to the longevity and performance of the system.
  • Page 4 TarTIng nsTallaTIon Preparation Check the following list of components to ensure that all parts are packed with your system. 1 - Storage Tank 1 - RO System 1 - Faucet 1 - Installation Kit Determine the location for the installation of the RO system. Avoid locations where the system might come in contact with hot water pipes or other hazards.
  • Page 5 nsTallaTIon roduCT aTer auCeT Drilling the Faucet Hole The product water faucet may be installed on any flat surface at least 2” in diameter. Check the underside of the location for interference. Porcelain/Enamel Sinks A 3/8” variable speed drill drill is recommended for this procedure. A spring loaded Relton style drill set is strongly recommended to prevent chipping.
  • Page 6 YsTem and auCeT Iagrams All tubing is individually labeled and color coded for ease of installation. 1/4” Black - Connects the feed water valve to the RO pre-filter 3/8” White - Connects the RO membrane product port to the storage tank 1/4”...
  • Page 7 ourCe and raIn aTer addle alVe Shut Off the Water Locate the water shut-off valve for the cold water feed line you choose to use for the supply. Accidentally hooking up the system to the hot supply line will permanently damage the membrane (See Conditions for operation). To assure you are using the cold water line, turn on both the hot and cold faucet.
  • Page 8: Troubleshooting

    CTIVaTIon aInTenanCe and roubleshooTIng Activating the System For the First Time Make sure all water supply/drain lines are secure and free from leakage. Slowly turn the saddle valve counterclockwise until fully open. Check stem seal for leakage. If necessary tighten stem nut lightly.
  • Page 9 ro d reenWaY rInkIng aTer YsTem arranTY What Does This Warranty Cover? This warranty covers any defects in materials and workmanship of the Greenway ® RO Drinking Water System when installed and operated within recommended parameters, with the exceptions stated below. How Long Does The Coverage Last? Greenway will warrant its RO Drinking Water System, for a period of one year from the date of purchase.
  • Page 10 Système d’osmose Water Technologies inverse pour eau potable 3 phases 50 GPD Water Technologies Water Technologies Manuel d’installation et d’utilisation Modèle : GRO1025-5-3F...
  • Page 11 able of onTenTs Introduction Page Installation Page 4 - 5 Diagrammes du système et du robinet Page Robinet-vanne à étrier pour les eaux usées et potables Page Mise en service, guide de dépannage et entretien Page Renseignements concernant la garantie Page Votre analyse d’eau Dureté...
  • Page 12 nTroduCTIon Veuillez lire ce manuel de service en entier avant de débuter l’installation. Ce système d’osmose inverse pour eau potable a été conçu pour une installation et un entretien rapide et simple. En lisant attentivement ce manuel d’instructions et en suivant les directives opérationnelles, vous vous assurez d’une installation réussie et d’un fonctionnement fiable.
  • Page 13 È À e l’I Tapes nTreprendre nsTallaTIon Préparation Vérifiez la liste des composants suivants afin de vous assurer que toutes les pièces soient dans l’emballage de votre système. 1 - Réservoir de stockage 1 - Système d’OI 1 - Robinet 1 - Kit d’installation Déterminez l’emplacement pour l’installation du système d’OI.
  • Page 14 nsTallaTIon obIneT pour au de roCédé Perçage du trou pour le robinet Le robinet pour l’eau de procédé peut être installé sur n’importe quelle surface plane d’un diamètre d’au moins 50,8 mm (2 po). Vérifiez le dessous de l’emplacement pour toute obstruction. Éviers en porcelaine/émail Une perceuse électrique de 9,52 mm (3/8 po) à...
  • Page 15 Iagrammes du ysTÈme du obIneT Toute la tuyauterie est individuellement étiquetée et comprend un code de couleur pour faciliter l’installation. 6,35 mm (1/4 po) noir - Relie la soupape pour l’eau d’alimentation au pré-filtre de l’OI. 9,52 mm (3/8 po) blanc - Relie le port de la membrane de l’OI au réservoir de stockage. 6,35 mm (1/4 po) orange - Relie le port de la membrane à...
  • Page 16 é obIneT anne À TrIer pour les sées eT oTables Couper l’alimentation en eau Localisez le robinet d’arrêt pour la conduite d’eau froide que vous avez choisi d’utiliser pour l’alimentation d’eau. Si vous branchez accidentellement le système à la conduite d’eau chaude, cela endommagera de façon permanente la membrane (voir conditions pour le fonctionnement).
  • Page 17: Guide De Dépannage

    Ise en erVICe uIde de épannage eT nTreTIen La mise en service du système pour la première fois Assurez-vous que toutes les conduites en alimentation d’eau et de purge soient sécuritaires et sans fuite. Tournez lentement le robinet-vanne à étrier dans le sens contraire des aiguilles d’une montre jusqu’à ce qu’il soit entièrement ouvert.
  • Page 18 d’oI aranTIe du ysTÈme pour oTable reenway Que couvre cette garantie? Cette garantie couvre tout défaut de matériel et de fabrication du système d’OI pour eau potable de GreenwayMD lorsqu’il est installé et utilisé à l’intérieur des paramètres recommandés, avec les exceptions énoncées ci-dessous. Pour combien de temps cette couverture est-elle active? Greenway garantit son système d’OI pour eau potable pour une période d’un (1) an à...