Clearances - Lochinvar CHP-WI-04 Installation And Service Manual

Commercial electric water heaters 9kw – 900kw input models
Table of Contents

Advertisement

CLEARANCES FROM COMBUSTIBLE CONSTRUCTION
12"
FIG. 4 Clearances from Combustible Construction
12"
FIG. 6 Clearances from Combustible Construction
CLEARANCES FROM COMBUSTIBLE CONSTRUCTION
Right Side -
6" (15cm) (24" (0.61m) for high kW vertical square models with an
additional control panel on right side)
Rear -
0"
Left Side -
0"
Front -
36" (0.91m) for service access to controls and heating elements
Top -
12" (30cm) for service access to electrical service, water connections and piping
Water Pipes -
1" (25.4mm)
36"
12"
6"
FIG. 5 Clearances from Combustible Construction
TABLE A
6
6"
36"
6"