Handle Installation
1. Install the handle folder assembly on the generator upper frame
using the 8×18 mm flange bolts.
2. Install the handle assembly on the generator upper frame pipe
using the 8×16 mm flange bolts, handle bush A, handle bush B, and
handle lower bracket.
TORQUE: 17–22 lbf·ft (24–29 N·m, 2.4–3.0 kgf·m)
8×16 mm FLANGE BOLT (8)
HANDLE ASSEMBLY
HANDLE BUSH A (2)
HANDLE BUSH B (2)
HANDLE LOWER BRACKET (2)
Operation must be checked after attaching the handle.
• Check that the handle can be folded smoothly.
• Check that the handle does not hang down by its own weight.
To extend handle:
Raise the handle to the horizontal position. The handle will click into
place when locked.
HANDLE
8×18 mm FLANGE BOLT (2)
HANDLE FOLDER ASSEMBLY
FRAME PIPE
HANDLE LOCK LEVER
ASSEMBLY
85