Honeywell Q7055A Installation Instructions Manual page 30

Building network adapter bna-1c/2cs/2dn
Table of Contents

Advertisement

BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN
C A U T I O N :
Using
interference on the network.
Please contact your network administrator to
retrieve a unique IP-Address. If you want to con-
nect the BNA to a customer network, make sure to
get in touch with the customers IT manager to
retrieve this IP-Address information.
dc
load
This is the minimum command sequence for setting
up a BNA device.
After that the application firmware can be invoked
by entering the command run or by pushing the
Reset button. When the Reset button is pushed, the
BNA Bootloader behaves as depicted in Figure 6-1
on Page 24.
30
unallowed
IP-Addresses
Download configuration
Definition of FTP server, path to
firmware and user account on FTP
server. This is necessary for loading the
application firmware into the BNA
device.
Load executable from FTP server
This
command
application firmware (executable) into
the BNA device. After successful down-
load, the application firmware is moved
into the Flash memory.
could
finally
loads
EN1B-0198GE51 R1004B
cause
the

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents