4. Boiler installation
sequence

4.1 General

The boiler should be mounted on a
flat and vertical area of wall of
sufficient area for the boiler plus the
required minimum clearances for
installation and servicing (fig. 10).
These are shown on the installation
template supplied with the boiler and
are:
5 mm either side of the boiler
100 mm below the boiler*
165 mm on top of the boiler
500 mm in front of the boiler **
* 150 mm where optional pre-
installation connecting group
(Art. no. 8015) is used.
** This clearance is only required to
enable easier access to the boiler
for servicing and may be
provided by an openable door,
etc.
Note: If the boiler is to be fitted in a
timber framed building, it should be
fitted in accordance with British Gas
publication reference DM2 'Guide
for gas installations in timber framed
housing.'

4.2 Boiler delivery

The TURBOmax is delivered in two
packs:
a. the carton containing the boiler
b. separately boxed flue accessory,
either:
1m horizontal flue accessory
(Art. No. 300 807); or
vertical flue accessory
(Art. No. 300 800)
Supplied By www.heating spares.co Tel. 0161 620 6677
fig. 11
13