GE AEH18 Series Owner's Manual And Installation Instructions page 13

Table of Contents

Advertisement

Available languages

Available languages

Window Installation Instructions
[] INSTALL THE CASE
IN THE WINDOW
(cont.)
[_
Use a wood block (obtained
locally)
between
the leveling
bolts and the wall if the wall is
weak or if the weight
of the air conditioner
falls between
the studs in the wall.
[_
Adjust
the leveling
bolts and nuts against the
outside
wall so that the case has a slight tilt
to the outside. -Iqghten nuts with an adjustable
wrench.
Use a level; no more than a 1/2 bubble
will be the correct
case slant to the outside.
[_
Extend the left and right accordion
panels
to the vertical
window
sashes. Drill pilot
holes and attach the top and bottom
corners
with 4 type D screws.
Type D
screw
Top mounting
rail
Type D
screw
Type D
screw
Type D
screw
171INSTALL SUPPORT
BRACKETS
AND THE FOAM TOP WINDOW
GASKET
[_]
Drill
pilot
holes
and attach
the support
brackets
with
two type
D screws,
one on
each side.
l
I
Cut the foam
top window
gasket
to the
__J window
width.
Stuff
the foam
between
the glass and the
window
to prevent
air and insects
from
getting
into the room.
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aem18 seriesAeh25 seriesAev24Aem25 seriesAew24Aeq24

Table of Contents